Forum quick links
LEED Certifying a Building with an EnergyStar label
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Dawn Brenner on
The downton high-rise I am attempting LEED certification has an EnergyStar label that just expired on Mar 31, 2011.
Weathered Concrete
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Lauren Fakhoury on
I'm looking to find the SRI value of weather beige concrete and weathered beige exposed aggregate concrete. Does anyone know where I can find these values?
Wall Panels, Tack Boards, Marker Boards
Schools-2009 IEQc4.6:Low-Emitting Materials—Ceiling and Wall Systemsposted by Cheryl Burkinshaw on
We're all still struggling with this credit in our office and trying to determine whether or not we stand a change of getting this point, or if we should abandon it.
LEED Documentation - is it required for this point
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Kelley Howell on
Our project approach to this point is pretty straightforward. We are using a water quality structure with a sand filter for the entire site.
Base building fixtures meet old LEED 2.0, but not LEED CI 2009
CI-2009 WEc1:Water Use Reductionposted by Sandra Eremic on
Our project occupies (4) out of (10) floors of a building which was LEED 2.0 certified. We are attempting Silver under LEED CI 2009.
Transient fixture uses
CS-2009 WEp1:Water Use Reductionposted by Carolina Vergnano on
Hi There, I've got two projects, one is a shopping mall and the other a health clinic, but I can't figure out the uses for the respective transients.
Manufacturer's Stockpile Material
CI-2009 MRc3.1:Materials Reuseposted by Gary Keyfauver on
I work for a major precast/prestressed manufacturer. Our products are always designed, manufactured and installed for each individual project.
AGMBC 2010 - Multi-building industrial plant certification
posted by Daniel Brum on
Hi there. I am working on an industrial plant 2009 LEED-NC/AGMBC 2010 certification.
How to treat reuse furniture in the calculation for FSC wood
CI-2009 MRc7:Certified Woodposted by Steve Khouw on
In a LEED project, we want to reuse the system furniture from the existing tenancy, the desktop made of wood, but not FSC certified.
SSc3 Brownfield Documentation
NC-2009 SSc3:Brownfield Redevelopmentposted by Josh Mauldin on
Our project is the renovation of an existing building from 1955. No Phase II ESA was done, but we hired an environmental consultant to do an asbestos and lead paint survey.