NC-2009 SSc6.2:Stormwater Design—Quality Control
posted by  Tiago e Silva  on 

I’m working on a Project in Portugal, which consists in a 13.400m2 site, with 6000m2 rooftop (harvests rain), 2500m2 green roof, 2735m2 of gardens, 306 m2 of planters and 1840m2 of impermeable pave

1
Tue Mar 29, 2011, 9:07 pm

Suggestions for Calculating Casegood area

CI-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elements
posted by  James Shook  on 

We have a library project that is reusing metal shelving. Since it is being used for the same purpose this credit indicates it should be part of MR1.2.

1
Tue Mar 29, 2011, 1:53 pm

Church - 'dress your best'

NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  SIG - Sustainability Main Account  on 

I'm working on (a renovation of) an existing church with 6 FTE, and 400 peak transients. 5% of 406 FTE = 20 bicycle parking spaces.

1
Fri Mar 11, 2011, 3:39 am

Modeling Snow-Melt Systems

NC-2009 EAc1:Optimize Energy Performance
posted by  David Hubka  on 

I am modeling a LEED building that includes a snow melt system. The system is served by the building's hot water boiler.

1
Fri Mar 11, 2011, 2:17 pm

EAc3 Exemplary Performance

CS-2009 EAc3:Enhanced Commissioning
posted by  BH .  on 

Thanks for all descriptions and comments related to differences beween EAp1 and EAc3. I`m still confused about Exemplary Performance and it`s "comprehensive envelope commissioning".

1
Thu Aug 16, 2012, 7:41 pm

CO2 sensor issue

CS-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  G B  on 

Hello all, I would kindly ask for an information please. My HVAC multizone system, looks like this. VAV AHU system (with sensible heat recovery, no mixing) + Fan Coil Units (FCU).

1
Wed Jun 1, 2011, 3:07 pm

Time line for PV installation

CS-2009 EAc2:On-site Renewable Energy
posted by  Sayeed Muhammad  on 

In our project we intend to install PV panels for 300KWp capacity. Its a NC2009 project aiming for LEED platinum. The building is office building with a 24hrs cafeteria.

1
Wed Apr 27, 2011, 6:47 pm

question about set of fan power in simulation program

NC-2009 EAp2:Minimum Energy Performance
posted by  lin wang  on 

The fan power calculated by the formula presented in APPENDIX G3.1.2.9 of ASHREA90.1-2007 is the sum of all the fan power including supply fan,returen fan,exaust/relief fan.

1
Mon Mar 14, 2011, 1:04 pm

Free materials

CI-2009 MRc4:Recycled Content
posted by  Martin O'Donnell  on 

Hi our company has moved to a new office and we are submitting for LEED gold.

1
Mon Mar 14, 2011, 12:52 pm

Re: Retail Project overview documents

General forums
posted by  David Posada  on 

Maria, Since there can be different people reviewing different credits, the overview documents are there to give all reviewers a clear idea of your whole project.