Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

underfloor system supplying minimum outside air with radiant panel

NC-v4 EQc5:Thermal comfort
posted by  X. Chen  on 

Hi, we are designing a project that has a DOAS unit serving code min outside air through underfloor plenum to the space with ceiling radiant panels handling heating and cooling load.

1
Mon Dec 4, 2017, 4:40 pm

For Campus

NC-2009 EAc4:Enhanced Refrigerant Management
posted by  Esteban Martinez  on 

Hello all, we are trying to comply with this credit to certificate a Campus in Colombia.

1
Tue Nov 7, 2017, 10:14 pm

Option 3?

EBOM-v4 LTc1:Alternative transportation
posted by  Catalyst Partners  on 

Has anyone had experience with Option 3?  It appears we will not get any points in Option 2 - it's a fairly isolated building where everyone drives on their own.  

2
Project Director
WSP USA
LEEDuser Basic Member
381 thumbs up
Tue Oct 10, 2017, 8:12 pm

Option 3 - Core Performance Guide???

NC-v4 EAp2:Minimum energy performance
posted by  Erica Downs  on 

The prescriptive path under Option 3 still references the "Advanced Buildings Core Performance Guide".  However, this guide has been "sunset" by NBI and no longer exists.  Typic

6
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Oct 10, 2017, 7:45 pm

Gas vented fireplace

NC-2009 EAp2:Minimum Energy Performance
posted by  Carlos Vazquez  on 

I have a project were there is a 24,000 Btuh gas vented fireplace. Is a wall device mostly radiant heater (70-75%) with a glass panel which does not have a fan.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Oct 10, 2017, 5:16 pm

Minimun size

ND-Plan-v4 MPR3:Must comply with project size requirements
posted by  NUBIA VALLES  on 

What is the minimum size for a LEED ND Project? I just found this about the maximum.

3
Tue Oct 10, 2017, 4:08 pm

Question regarding minimum filter requirements

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Henry Delgado  on 

The questions is in regards to the LEED Reference guide for green building design and construction, 2009 Edition, IEQ Prerequisite 1 - Minimum indoor air quality performance (pg 407), Case 1 - Mech

3
Tue Oct 10, 2017, 1:56 pm

LDP for EBOM Recertification - Pros and Cons?

Discuss the LEED Dynamic Plaque and Arc
posted by  Kimberlee Dobbins  on 

I know of one building attempting to use LDP for EBOM recertification. Has anyone successfully achieved recertification and willing to share the experience?

2
Default Avatar
Sustainability Coordinator
Austin Convention Center, Austin, Texas
LEEDuser Basic Member
5 thumbs up
Mon Oct 9, 2017, 2:14 pm

infirmary

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Francesco Passerini  on 

We are dealing with an educational building and we are considering ASHRAE 62.1-2010. Inside there is an infirmary.

Which occupancy category shall I consider for that space?

1
Mon Oct 9, 2017, 2:54 pm