O+M Starter Kit for CI
CI-v4 INc1:Innovationposted by Kristen Magnuson on
Our CI project Owner is occupying 100% of the building, including core space. They are also responsible for operations and maintenance practices. However, they are do not own the building.
EU Standards vs LEED
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Tanja Arnesson on
EU Standards vs LEED We have some problem with the VOC (g/l) content in our products.
Service Sink Baseline flow
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Jorge Torres-Coto on
I have a project that includes mainly Vocational Classrooms. As such, each classroom has Service Sink for washing hands after each class (Diesel, Auto Mechanic, Carpentry, Welding, Sheet Meta
Pipe insulation sealant???
CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Edgar Arevalo on
I'm trying to figure out, under what category would pipe insulation joint sealant fall under?
Retail -Clarifying Reference Guide language indicating "14 days"
Retail-CI-v4 EQc4:Indoor air quality assessmentposted by Stacey Olson on
The LEED reference guide indicates "Retail projects may conduct the testing within 14 days of occupancy." I read this to mean that air sampling can occur up to 14 days post occupancy.
Using Default Roof Material SRI values
NC-v4 SSc5:Heat island reductionposted by Lauren Sparandara on
Hello - I noticed that there are default SRI values available for use for the ground SRI values through CIR #10411 - just as was done for LEED 2009 - are there some default values that can be
Finding and using the new Wiggio "BuildingGreen Community"
posted by Nadav Malin on
Hi folks,
NC-v4 MR
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Lissa Spitz on
Can anyone clarify the following section from p469 of the ref guide? It seems to be saying only include MEP materials that are credit compliant in calculations.