NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Lise Dannesboe on
We are pursuing option 1 Flush Out. Our building includes a large datacenter.
Spaces not in Matrix - Vending, Recycling, and janitor's closets
posted by Lyle Axelarris on
Three questions here: -What space type should I use for a vending room (enclosed room with vending machines)? -What space type should I use for a small enclosed room for recycling containers? -What
Flush out in a Warehouse
NC-2009 IEQc3.2:Construction IAQ Management Plan—Before Occupancyposted by Paula Hernandez on
Hello to everyboty and Merry Christmas, I have to make the flush out in a building which is mostly a Warehouse, that will be regularly occupied, with mechanical ventilation but no air conditioning.
Run-off calculations for a site with future extensions
NC-2009 SSc6.1:Stormwater Design—Quantity Controlposted by Valentin Grimaud on
Dear community, We certify a project that will have two extensions in the future. Because of this we cannot earn crédits SSc5.1 and SSc5.2 as per the MPR.
IEQ Ductwork Protection
NC-2009 IEQp1:Minimum IAQ Performanceposted by Jennifer Kissinger on
Should the ductwork that is delivered to the jobsite for installation be wrapped at the fab shop on both ends or can the ends of the duct be wrapped onsite prior to unloading from the truck?
Tenant area with prescribed HVAC system in a CS project
CS-2009 EAp2:Minimum Energy Performanceposted by farhana imran on
Dear Expert, In our CS project the owner wants to limit the tenants to a specific HVAC system with under floor air distribution.
FTE Calculation for 3 shifts?
posted by Nicole Kimoto on
I have a building that has 2 floors, each with 3 FT shifts, but with different personnel counts.
LEED Online Forms
NC-2009 MRc2:Construction Waste Managementposted by Robyn Reichert-Cook on
It wants me to select one of the "additional details" but neither seem correct. What is considered "standard submittal" process?
Level playing field for Recycled Content
NC-2009 MRc4:Recycled Contentposted by barbara anderson on
Can someone please tell me how a LEED specification specialist establishes the recycled content requirement?
Use of existing facilities - Cement Distribution Plant, Colombia
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Edgar Rodriguez on
We are working in Colombia on a new 4,840sqft "dinning room facility" that will serve all users 24/7 of already existing administrative offices and truck drivers (this existing facilities are not c