Fire exits
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Mike D on
Are fire exits/emergency stairs considered part of the roof or can these be excluded?
Recertification & Performance Period Purchase
EBOM-2009 IEQc3.4:Green Cleaning—Sustainable Cleaning Equipmentposted by Simon Sue on
The credit requires all equipment purchased during the performance period to be 100% compliant to sustainable criteria.
European Projects
CS-2009 EAc6:Green Powerposted by Maria Porter on
For LEED EB:OM there is an ACP for this credit.
Can we calculate and apply recycled content in reused items?
NC-2009 MRc4:Recycled Contentposted by Renee Shirey on
We are reusing playground equip from the existing bldg and are going to relocate them and use them in our new building/site.
Relocated UPS
CI-2009 EAp2:Minimum Energy Performanceposted by Gaston Michaud on
We are currently working on a project that includes a 120 kVA UPS that is not Energy Star rated. This equipment was brought from another facility; should we include this in our EAp2 calculations?
Off-peak charging
Pilot-Credits LTpc70:Green vehiclesposted by Amra Ivojevic on
Hello I would like to know what LEED understands with off-peak charging. Is it trying to help charge electric vehicles off-peak, when they won’t bring down the power grid?
European standard equivalent
CS-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Productsposted by Antonio Rodriguez on
Is European E1 standard an acceptable equivalent to comply with this credit documentation? I believe it is, but would appreciate if someone confirms. Thank you.
Medical equipment not using process water
Healthcare-v2009 WEp2:Minimize potable water use for medical equipment coolingposted by Alicia Villanueva on
Hallo, 1.Our client affirms that the medical equipment such as MRI, tomography and x-ray does not use water at all because they are digital. Due to our lack of knowledge about medical equipment w
Smoking Zone for outdoor dining
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Jackson . on
We are doing a NC 2009 retail for fastfood project, the operator intend to have outdoor dining smoking zone My question: if the outdoor dining smoking zone is 25 ft away from all the entrance, int
ID credit for machine roomless elevators
NC-2009 IDc1:Innovation in Designposted by Debbie Ziegler on
Does anyone have any recent experience being awarded an ID point for using machine roomless elevators - submitting documentation from the manufacturer regarding process load/energy performance savi