Forum quick links
Changing the Timeline
posted by Charles Nepps on
After uploading an considerable amount of credit data (but not submitted for review), I noticed that the project is set up to have a split review.
Catch
NC-2009 EAc6:Green powerposted by Jean Marais on
Are there any catches to proving that the RECs that we buy are used only on a specific LEED project? Should I ask the seller to specify the facility's name or something on the REC?
Complex Credit Definition
posted by Kristen Dotson on
I've clicked on all the links that have been posted in this blog in hopes of finding the list of "complex credits" but I haven't seen anything. The link on the GBCI website is broken.
How can we get feedback on the pilot credit?
Pilot-Credits SSpc82:Local food productionposted by Heather DeGrella on
I am wondering if anyone who has posted has been able to get feedback any other way? I tried submitting my same question via LEEDonline and have received no response.
Fixture Replacement
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Patrick Salmon on
Our project will be pursuing the thirty percent (30%) savings threshold by including fixtures both within and outside the LEED project boundary.
LEED Interpretation 10372
NC-2009 MRc7:Certified Woodposted by Tristan Roberts on
I don't think the policy it gives is anything new—a lot of us have worked to choose to report wood content as either recycled or FSC, but not both—but FYI, LEED Interpretation 10372 was released on
LEED-NC or LEED-CI
posted by Samuel Nation on
We are renovating a large portion of a bldg on a University campus but there is a significant area of the building we are not touching at all. It was renovated a couple of years ago.
Pressure Drop adustment in Section 14 Tables
NC-2009 EAp2:Minimum Energy Performanceposted by Omar Elrawy on
Actually I'am not able to correlate section 14 required inputs under pressure drop column "CFMd", and the requirements of ASHRAE TABLE 6.5.3.1.1 B in (pascals/ in.w).
Option 3 Under LEED ND V4
ND-v2009 SLLc2:Brownfields redevelopmentposted by Martine Desbois on
Could you please explain that Option. I am not sure I understand when it is applicable. Thank you OPTION 3.