Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Changing the Timeline

Living with LEED Online - quirks, bugs and hiccups
posted by  Charles Nepps  on 

After uploading an considerable amount of credit data (but not submitted for review), I noticed that the project is set up to have a split review.

5
NH Green Consulting
LEEDuser Premium Member
80 thumbs up
Tue Apr 8, 2014, 4:34 pm

Catch

NC-2009 EAc6:Green power
posted by  Jean Marais  on 

Are there any catches to proving that the RECs that we buy are used only on a specific LEED project? Should I ask the seller to specify the facility's name or something on the REC?

5
Tue Apr 8, 2014, 3:35 pm
7
Principal
The Beck Group
LEEDuser Basic Member
98 thumbs up
Tue Apr 8, 2014, 2:59 pm

Complex Credit Definition

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Kristen Dotson  on 

I've clicked on all the links that have been posted in this blog in hopes of finding the list of "complex credits" but I haven't seen anything. The link on the GBCI website is broken.

3
Sustainability Professional
Bright Green
LEEDuser Basic Member
31 thumbs up
Tue Apr 8, 2014, 6:34 am

How can we get feedback on the pilot credit?

Pilot-Credits SSpc82:Local food production
posted by  Heather DeGrella  on 

I am wondering if anyone who has posted has been able to get feedback any other way? I tried submitting my same question via LEEDonline and have received no response.

2
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Mon Apr 7, 2014, 11:03 pm

Fixture Replacement

CI-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Patrick Salmon  on 

Our project will be pursuing the thirty percent (30%) savings threshold by including fixtures both within and outside the LEED project boundary.

5
Mon Apr 7, 2014, 6:44 pm

LEED Interpretation 10372

NC-2009 MRc7:Certified Wood
posted by  Tristan Roberts  on 

I don't think the policy it gives is anything new—a lot of us have worked to choose to report wood content as either recycled or FSC, but not both—but FYI, LEED Interpretation 10372 was released on

2
Principal
Jason Grant Consulting
LEEDuser Expert
115 thumbs up
Mon Apr 7, 2014, 3:34 pm

LEED-NC or LEED-CI

LEED Rating System Selection
posted by  Samuel Nation  on 

We are renovating a large portion of a bldg on a University campus but there is a significant area of the building we are not touching at all. It was renovated a couple of years ago.

3
PE, LEED AP B D + C
DVPE
LEEDuser Basic Member
2 thumbs up
Mon Apr 7, 2014, 2:50 pm

Pressure Drop adustment in Section 14 Tables

NC-2009 EAp2:Minimum Energy Performance
posted by  Omar Elrawy  on 

Actually I'am not able to correlate section 14 required inputs under pressure drop column "CFMd", and the requirements of ASHRAE TABLE 6.5.3.1.1 B in (pascals/ in.w).

7
Green Building Consultant | Researcher
GreenA Consultants
LEEDuser Basic Member
38 thumbs up
Mon Apr 7, 2014, 2:31 pm

Option 3 Under LEED ND V4

ND-v2009 SLLc2:Brownfields redevelopment
posted by  Martine Desbois  on 

Could you please explain that Option. I am not sure I understand when it is applicable. Thank you OPTION 3.

3
Fri Apr 4, 2014, 5:23 pm