Average Pressure Differential Calculation

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Sunayana Jain  on 

How is average pressure differential calculated? What is the condition of door assumed to calculate above. Thanks!

7
Default Avatar
Sustainability Specialist
LEEDuser Basic Member
1 thumbs up
Fri Oct 11, 2013, 6:00 pm

Building Envelope in Baseline for Major Renovation

CS-2009 EAp2:Minimum Energy Performance
posted by  Maria Porter  on 

In the Baseline model for a major renovation, for the envelope part: Do we use the “normal” Baseline elements as are in appendix G or do we model the envelope as it was before the major renovation

4
Sustainability specialist
Skanska Sweden
LEEDuser Basic Member
205 thumbs up
Fri Oct 11, 2013, 5:28 pm

Marine Grade Plywood

NC-2009 IEQc4.4:Low-Emitting Materials—Composite Wood and Agrifiber Products
posted by  Nicole Seekely  on 

I've been told there's no marine grade plywood product that I can use on foodservice millwork that complies with this credit.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Oct 11, 2013, 4:42 pm

Baseline equal to zero

ND-v2009 GIBp3:Minimum building water efficiency
posted by  Karyn Rodrigues  on 

Hi, I have three buildings within the LEED ND boundary, and one of them is not going to pursue any green building certification.

3
Senior consultant, LEED AP ND & BD+C
Arup
LEEDuser Basic Member
10 thumbs up
Thu Oct 10, 2013, 10:57 pm

ID credit: Aluminum form-work system

NC-2009 IDc1:Innovation in Design
posted by  Eric Carter  on 

Our contractor would like us to consider attempting an Innovation credit for their use of an aluminum form-work system for all of the tilt-up concrete elements built in the project: the intent of t

3
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Thu Oct 10, 2013, 4:55 pm

Exhuast fan and 62.1 compliance

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Jatuwat Varodompun  on 

If we use an exhuast fan for an office and have no clear location of OA intake, can we comply with 62.1?

2
Default Avatar
HVAC consultant
Optimized Systems
LEEDuser Basic Member
19 thumbs up
Thu Oct 10, 2013, 1:06 pm

Tenant design and construction guidelines- CS Sc9

LEED Guidance for Campuses and Multiple Buildings
posted by  Noriko Nagazumi  on 

Hi All, Th Appendix A - AGMBC Applicability for Credits and Prerequisites in LEED 2009 Design & Construction Rating Systems describes a Mater Tenant Design and Construction Guideline for SSc9

2
Technical Customer Service Specialist
GBCI
LEEDuser Premium Member
105 thumbs up
Thu Oct 10, 2013, 11:26 am

Submit a Low Mercury ID Credit

NC-2009 IDc1:Innovation in Design
posted by  Joel Register  on 

I would like to use the EB: MRc4-low mercury bulb credit for an ID credit in a LEED-CI project. What is the process in in submitting this as an ID credit.

8
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Thu Oct 10, 2013, 7:13 am

documentation issue

Pilot-Credits EApc56:Renewable energy - distributed generation
posted by  Noriko Nagazumi  on 

Hi, Our project will lend the rooftop to other company "A" which will install PV panels on the entire roof area and sell generated electricity to utility company. The contract between the project o

4
Director, Sustainability Programs
Digital Realty
LEEDuser Basic Member
3 thumbs up
Thu Oct 10, 2013, 6:45 am

Incomplete Spaces

NC-2009 PIf1:Minimum Program Requirements
posted by  Annalise Reichert  on 

I know that if there are incomplete spaces at the time of certification the owner needs to write a letter of commitment indicating the remaining spaces will satisfy LEED requirements.

2
Thu Oct 10, 2013, 6:21 am