Energy modeling for an industrial facility
NC-2009 EAc1:Optimize Energy Performanceposted by Mohamed M. Abd Elhameed on
I am working on an energy model for a Factory that was registered under LEED v3. The factory has no HVAC system except for some ventilation fans.
Energy modeling for an industrial facility
NC-2009 EAc1:Optimize Energy Performanceposted by Mohamed M. Abd Elhameed on
I am working on an energy model for a Factory that was registered under LEED v3. The factory has no HVAC system except for some ventilation fans.
Energy modeling for an industrial facility
NC-2009 EAc1:Optimize Energy Performanceposted by Mohamed M. Abd Elhameed on
I am working on an energy model for a Factory that was registered under LEED v3. The factory has no HVAC system except for some ventilation fans.
LEED HC 2009 - IEQc8.1 Daylight
Healthcare-v2009 IEQc8.1:Daylight and views - daylightposted by Christie Morris-Withers on
In order to get this credit it appears that all windows with "high-contrast situations" must have glare control devices. Are these devices also required to be view-preserving and automated?
Off-site donated land - Organization recommendations?
NC-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Greg Romanczyk on
Hello, does anyone have an organization they have worked with for the Option 2, off-site donated land option?
Calculating the leakage area for a door
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Nishank Shah on
I needed some help in calculating the leakage area of a door. Lets say the door has a total area of 30 sq. ft. Now, how do I calculate the leakage area to insert in the equation: Q = CA (dp)^n
Option 1: Zoning and controls
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Ricardo Sá on
Hi, The project is basically a huge sales area with some office spaces.The sales area is served by multiple compact rooftop units and the office areas are served by DOA´s for ventilation purposes
Option 1: Equipment Efficiency
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Ricardo Sá on
Hi, I have several compact rooftop units serving a big sales area. However, only 80% of them is actually new equipment that meet the credit's criteria.
Non-Conventional purchases
EBOM-v4 MRc1:Purchasing - ongoingposted by Becky Stumm on
I'm working on a convention center, and they don't buy many office supplies. Their major purchases are cleaning supplies ( and fits in the IEQ- green cleaning credit) and uniforms.
Schools requirements in CI?
CI-v4 LTc3:Access to quality transitposted by emily reese moody on
Is it a super obvious typo that requirements for Schools projects are included in the Reference Guide for CI?