Forum quick links
Campus cooling towers
CS-v4 WEc3:Cooling tower water useposted by Ted Kussow on
The building being designed is to be connected to a campus cooling system with cooling towers. Can we get this credit if the campus cooling towers meet the requirements?
Cleaning Equipment compliance with IEQC3.1
EBOM-2009 IEQc3.1:Green Cleaning—High-Performance Cleaning Programposted by Jubilee Daniels, MLA, LEED AP O+M on
I have a building that is pursuing recertification under LEED EBOM V2009. They achieved IEQC3.4 Green Cleaning - Sustainable Cleaning Equipment in their previous certification.
Energy cost for Baseline and proposed case CHP system
NC-2009 EAp2:Minimum Energy Performanceposted by SAMY Chamy on
Dear All
Large Developed Sites
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Priya Venkat on
The project has large site area. The distance between site entrance and bus stop is within 400 m.
Shuttle between building and secured site entrances
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by J Douglas Dietrich on
Distance from LEED building to public transit stops is too far to meet requirements, however distance from the guardhouse gate controlling access to the secured site on which the LEED building is l
Building entrance vs site entrance
NC-2009 SSc4.1:Alternative Transportation—Public Transportation Accessposted by Alicia Freire on
Hi, I am working on a development located in the centre of a large site.
Which part of a toilet need water label?
CI-v4 WEp1:Indoor water use reductionposted by Katarzyna Toczynska on
Hi,
we're just deciding on water fixtures on our project and have some trouble with choosing water closets. Our toilets consist of:
- a separate bowl
Number of Bicycle Racks and Changing/shower facilities
CS-v4 LTc6:Bicycle facilitiesposted by LEED Pro Consultant on
We are currently working on a CS building of 146,617 sqm. The calculations according to the Reference Guide requirements, result in 734 racks and 99 shower/changing facilities.
Lost login & Re - registering a Project
posted by Madushan Samarakoon on
We are asked to do the LEED consultancy for a project which had been registered previously by another LEED consultant (admin).