Forum quick links
Min OA rate of a VAV syts with DCV
NC-2009 IEQp1:Minimum IAQ Performanceposted by Chellapillai Srinivasan on
How do one determine minimum outdoor air intake flow of a VAV system coupled with demand controlled ventilation to comply with ASHRAE 62.12007 standard required for at different operating condition
Regularly Occupied Space in Core & Shell for office buildings
posted by eileen hughes on
Are bathrooms, stairwells, and corridors considered a regularly occupied space for a LEED Core & Shell office building?
1 FTE
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by on
Is it possible to achieve this credit if there is only 1 FTE? For example, how would you develop a carpool management plan?
paint paste
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Dario Ibarguengoitia on
Which category should paint paste fall under? How can I establish the VOC limit? Thank you very much
Combination low-emitting parking and car pooling spaces possible
CI-2009 SSc3.3:Alternative Transportation—Parking Availabilityposted by Mark Frey on
In our C&S project the building owner provides 15 parking spaces for low-emitting and fuel-efficient vehicles. The main tenant will rent and use these parking spaces.
IEQp1 required signatory
NC-2009 IEQp1:Minimum IAQ Performanceposted by Anne-Maria Vierinen on
Our HVAC designer is also the ventilation systems designer on our project.
PEAK Transients--What makes for PEAK? Not TOTALLY Occupied?
NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Brooks Critchfield on
When calculating the PEAK transients, do we need to plan for every assembly space, every classroom, every office, every etc.
Charging stations and Calgreen
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Deborah Lucking on
Our project in California is pursuing SSc4.3 by providing charging stations.
Permanent Monitoring Devices
NC-2009 IEQc7.2:Thermal Comfort—Verificationposted by Scott Rosch on
We have a smaller government project that does not have the need or budget for a building automation system, which we have used as the monitoring equipment for this credit previously.
EAc6 in Abu Dhabi
NC-2009 EAc6:Green powerposted by Scott Bixby on
I am trying to calculate the REC quantity required for a building in the UAE to get EAc6 (Green Power), but noticed that the CBECS method does not apply to buildings outside the US.