EA 6.1 Good HVAC Design and Installation

LEED for Homes (LEED-H) Forum
posted by  Ricky Li  on 

There is a note stating that "Homes with no heating must follow the performance approach (e.g. EA1), and may not use the prescriptive pathway".

1
Sat Dec 29, 2012, 1:25 am

Cost to be Excluded in the total proj material costs for MR CR3

NC-2009 MRc3:Materials Reuse
posted by  Benjie Herrera  on 

I just want to inquire if we will include HVAC equipment, PV arrays, Solar hotwater collectors, generator, fire alarm control panels, etc.

1
Wed Sep 21, 2011, 4:29 pm

Ventilation for storage an mechanical rooms

Schools-2009 IEQp1:Minimum IAQ Performance
posted by  Rodrigo Ubilla  on 

Dear experts, We are working on a university building wich has 2 underground floors, with mechanical and storage rooms in them, all these rooms are adjacent to the stairs.

1
Sat Nov 19, 2011, 3:32 pm

Pilot Credit Content?

Pilot-Credits EQpc22:Interior lighting - quality
posted by  Jonathan Weiss  on 

The content listed here on this page differs from the current content on the USGBC website - they have a similar but different set of requirements listed. Which one is currect?

1
Sun Nov 13, 2011, 5:25 am

Water heaters

NC-2009 EAp2:Minimum Energy Performance
posted by  Paula Hernandez  on 

I have to model a building which is using solar pannels electric heaters.

1
Mon Sep 19, 2011, 5:38 pm

Cumulative Facade Intrusion?

Pilot-Credits PC14:Walkable Streets
posted by  Kimberly Frith  on 

Our project has two facades extending along sidewalks. Going by the credit requirements, we cannot have more than fifty feet of blank facade.

1
Tue Nov 15, 2011, 5:38 pm

Residential Bike Storage in Apartments?

Pilot-Credits PC13:Bicycle Network, Storage, and Changing Rooms
posted by  Kimberly Frith  on 

The construction requirements for the bicycle storage seem to suggest centralized bicycle parking.

1
Wed Nov 30, 2011, 2:41 pm

Public tranportation Access

CI-2009 SSc2:Development Density and Community Connectivity
posted by  ANDREW MOISEEV  on 

We have a bus stop right outside our door and a second route a mere .32 miles away, will that be acceptable, how hard and fast is the 1/4 mile rule?

1
Thu Sep 29, 2011, 4:58 pm

bicycle storage and changing rooms

NC-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Rooms
posted by  B MS  on 

We are working on a mixed used (commercial and residential) building. We have FTE 421 in commercial whereas total no. of residents is 28. the peak transients is 731. we calculated the no.

1
Thu Sep 29, 2011, 4:42 pm

Is it possible to get post development run off in negative?

NC-2009 SSc6.1:Stormwater Design—Quantity Control
posted by  B MS  on 

Our project is located in Kathmandu, Nepal and I have a few questions regarding the following points. 1.

1
Wed Nov 23, 2011, 4:52 pm