CI-2009 MRc4:Recycled Contentposted by Martin O'Donnell on
Hi our company has moved to a new office and we are submitting for LEED gold.
Re: Retail Project overview documents
posted by David Posada on
Maria, Since there can be different people reviewing different credits, the overview documents are there to give all reviewers a clear idea of your whole project.
Alternative Transporation for an inn.
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Nana Simopoulos on
We have an inn that is seeking LEED certification. Our innkeeper lives in the building. Because we are in the center of a small town, we walk to the post office, bank and grocery store.
Finish Grading, Seeding and Plantings - applicable for MRc5?
NC-2009 MRc5:Regional Materialsposted by Renee Shirey on
In the Resource book on page 383 and 385 I see tables that have "plant material" as one of the regional items, but I am confused by the language in the actual credit - "BUILDING materials or produc
FTE for residential project Case 3 of LEED CS
CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Paola Figueiredo, Newton Figueiredo on
I have a question to calculate the FTE for a residential project (2 towers in one condominium of one building).
Transportation Canopies
NC-2009 SSc7.2:Heat Island Effect—Roofposted by Aliesa Adelman on
We have a project where caopies at an intermodal station are considered a roof system by code yet are not attached to the facility and do not fall under the LEED definition of a roof.
Mechanical Schedules
posted by David Eldridge on
This usually will be the portion of the construction documents that show the major HVAC equipment in tabular form.
How to model slab-on-grade floor in simulation program
NC-2009 EAp2:Minimum Energy Performanceposted by lin wang on
As ASHREA90.1-2007 shown,the slab-on-grade floor of baseline building shoud be modeled by the parameter of F-factor.But the parameter to model slab-on-grade floor in program eQuest is U-value or pr
ASHRAE Mandatory Provisions for Power
NC-2009 EAp2:Minimum Energy Performanceposted by Carolina Vergnano on
I'm working on LEED for a stadium, and we have a bit of trouble interpreting requirements of ASHRAE 90.1 -2007 section 8. The project will have a tranformer that will filter the high voltage.
Exposed slopes
CS-2009 SSp1:Construction Activity Pollution Preventionposted by Gabriela Hernández Castillo on
If the construction site is really "active", that is to say there is earth movement everyday and the slopes are changing every couple of days, do we need to protect them everysingle day? According