CI vs NC

LEED Rating System Selection
posted by  Dale Dunnet  on 

Our client has a 100 year old building in the downtown area of a small town.This building will be a total interior demolition (exterior walls/ windows remain).

1
Mon Nov 4, 2013, 2:44 am

VAV minimum for Ds

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  George Kotsis  on 

Hello all, I am completing the 62mzcalc spreadsheet during heating mode. VAV box minimums are typically 30% for systems with reheat.

1
Thu Feb 13, 2014, 6:11 pm

No new parking with LE and FE spaces

NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehicles
posted by  Denise Dauplaise  on 

Our project is on a campus, where there is an existing parking ramp nearby. There will be "no new parking" used on SSc4.4.

1
Fri Aug 23, 2013, 2:49 pm

EAp2 Sample L4 Narrative

CS-2009 EAp2:Minimum Energy Performance
posted by  Thomas Newbold  on 

Are there any sample narratives available on LEEDUser to satisfy Upload L-4? "Provide a detailed narrative describing the intended credit Files: approach, including energy efficiency measures that

0

How to Claim Credits for Natural Ventilation in Multifamily High

NC-2009 IEQc2:Increased Ventilation
posted by  zhao yongqing  on 

What is the methodology for LEED projects to claim credits (if possible?) for natural ventilation in dwelling units?

1
Mon Nov 4, 2013, 1:58 am

charging columns

NC-2009 EAc1:Optimize Energy Performance
posted by  Francesco Passerini  on 

In the courtyard of the building that I’m modelling two charging columns for electric vehicles are going to be installed. Shall I consider them as process energy?

1
Thu Aug 22, 2013, 8:14 pm

Using the Group EAP2 Spreadsheet

LEED Guidance for Campuses and Multiple Buildings
posted by  Robert Wichert  on 

Does anybody have any experience with the Excel spreadsheet for group energy analysis?

1
Thu Aug 22, 2013, 1:57 pm

Fossil fuel furnace

NC-2009 EAp2:Minimum Energy Performance
posted by  Francesco Passerini  on 

According to system 3 of Table G3.1.1A I have to model a fossil fuel furnace for a baseline model. What efficiency shall I consider? "Warm air unit heater, gas-fired" in Table 6.8.1E, i.e. 80%?

1
Thu Aug 22, 2013, 3:14 pm

Elegibility of Overwater Bungalow projects

NC-2009 MPR2:Must be a complete, permanent building or space
posted by  Luis Huertas  on 

The proposed project is located in an island and the intent is to locate bungalow cabins over water in piers (see: http://www.islands.com/gallery/top-19-overwater-bungalow-resorts) along with some

1
Tue Nov 5, 2013, 3:42 pm

Baseline System Fan Power...

CS-2009 EAp2:Minimum Energy Performance
posted by  Therese Malm  on 

...is calculated automatically by the energy simulation tool we use according to appendix G13.1.2.9.

1