Several questions
LEED Energy and EQ Documentation Tips from LEED Reviewers
posted by Gustavo De las Heras Izquierdo on
I found the video about meeting the ventilation prerequisite very useful.
1
Mon Aug 28, 2017, 11:17 pm
The link for the "EQ and EA
LEED Energy and EQ Documentation Tips from LEED Reviewers
posted by Craig Graber on
The link for the "EQ and EA Exercises v2" file isn't working - can you please fix? Thanks!
0
Craig, that's fixed. Thanks
LEED Energy and EQ Documentation Tips from LEED Reviewers
posted by Tristan Roberts on
Craig, that's fixed. Thanks for the heads up!
0
Hi, there is a problem with
LEED Energy and EQ Documentation Tips from LEED Reviewers
posted by Greenlab on
Hi, there is a problem with the file " LU_Minimum IAQ Perfo
0
Drawing ,Design tips from LEED /Green building Aspect
LEED-NC v4 Explained in Two Pages
posted by Subrota Roy on
Hi,
I am going to Drawing Design for MEP system of one LEED certification Gold rating factory building project.
Please give any guideline/data or any MEP DBR or if any, for designing Architectural Dr
1
Fri Aug 25, 2017, 4:12 pm
Information needed for ARCSKORU tools
LEED-NC v4 Explained in Two Pages
posted by Subrota Roy on
Hi,
When we submit the initial data to the ARC then how many days required to get the score?
While we get the score (say 35) then after that if we target some point and implement the required step to
0
LTc7: Reduced Parking Footprint
Guide to Exemplary Performance Credits in LEED-NC v4
posted by Erin Holdenried on
the EP thresholds for LTc7 are . . .
Case 1. Achieve a 40% parking capacity reduction from the base ratio.
Case 2.
1
Sat Aug 26, 2017, 3:20 pm
I am involved in providing
Pointers for First-Time LEED Projects
posted by Sam Meekins on
I am involved in providing hospitals with a Grant for a Smart Cities Initiative, to install 17 Emergency Water Storage Tanks for Disaster Relief according to CDC, EPA and State Guidelines.
1
Wed May 23, 2018, 4:00 pm
Baseline Economizser Requirement for Data Center Rooms
NC-2009 EAc1:Optimize Energy Performanceposted by Hirak Patel on
Hi, I am modeling Airport Traffic Control Tower project for LEED 2009 and I have question regarding economizer requirement. We have data center rooms which are served by CRAC units.
2
Thu Apr 12, 2018, 6:56 am
1