Multiple Street Frontages
Pilot-Credits PC14:Walkable Streetsposted by Carrie Webster on
Our project is on a corner and has two street frontages, with the primary façade on the "main street" and one side along a side street.
Energy Recovery Bypass
NC-2009 EAp2:Minimum Energy Performanceposted by Kalyan Nishtala on
Hi, I am working on a building which includes DOAS units with energy recovery cores on the proposed systems. The baseline systems do not require energy recovery per ASHRAE 90.1-2007.
RWH Pond outside LEED Boundary
NC-2009 PIf4:Schedule and Overview Documentsposted by ABDUL MUTHALIB MOHAMED on
Our project building is located in a campus and it is registered individually. Rainwater harvesting pond is located in the campus but it is outside the LEED Boundary.
Building Envelope Cx Checklist for LEED Documentation
NC-v4 EAc1:Enhanced commissioningposted by Joyce Kelly on
I am currently developing a Building Envelope Cx Checklist for LEED v3 projects.
OPTION 2. ENVELOPE COMMISSIONING (2 POINTS)
NC-v4 EAc1:Enhanced commissioningposted by Ciaran McCabe on
Can anyone identify the range of Building Envelope seasonal tests that are required to satisfy Option 2. Is there a typical list of activities outlined by LEED.
2009 NC form for substitution
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Yukari Treible on
Trying to substitute the NC 2009 IEQc4 forms in place of 2009 Schools, but can't find a valid form download. Anything I find says it's a reference only sample form.
Credit Wording
CI-2009 WEc1:Water Use Reductionposted by Matthew Fortin on
I am in the process of certifying a CI space.
Fan Power and Fan Power Adjustment (FPA)
NC-2009 EAp2:Minimum Energy Performanceposted by Vassil Vassilev on
Greetings, In the project we are modeling, the following issues are still not quite clear for us and we'd appreciate any advice on the matter. Baseline system is 8.
Future Alternative Compliance Paths
Pilot-Credits PC14:Walkable Streetsposted by Douglas Flandro on
I would like to see some more options added to this credit to encourage walking on the project site such as tables and benches with solar powered charging stations, outdoor theaters, performance ar
NFRC Rated Fenestration
NC-2009 EAp2:Minimum Energy Performanceposted by Jatuwat Varodompun on
For the proposed model, can we refer to table A8.2 for U-factor of the window but refer SHGC and VLT to the manufacturing data (tested based with NFRC standard)?