Can we involve PPA's?
Schools-2009 EAc2:On-Site Renewable Energyposted by kerrie kannberg on
Is there any way to involve a PPA (Power Purchase Agreement) or similar funding mechanism for EAc2? The language in the guide is not specific, as they mention a "energy system owner".
Epoxy for walls
NC-2009 IEQc4.2:Low-Emitting Materials—Paints and Coatingsposted by Erica Downs on
does anyone know how epoxy wall paint would be classified? simply as paint? or an architectural coating? is it even covered under LEED? thanks!
Changes to Recognition Package
posted by Erin Emery Hartz on
Hello Brian, Prior to this change, there was one policy for LEED 2009 projects and another for everyone else, despite project fees remaining the same. This change eliminates that discrepancy.
Open Space Requirement
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Elliot Powers, LEED AP BD+C on
Count me in with those frustrated with this credit language/ requirements.
No irrigation at all
CS-2009 WEc1:Water Efficient Landscapingposted by Yanina Ibañez on
Hello, in my project there will be no irrigation at all because of the adapted plants plant in all the green roofs. How do we demonstrate the achievement of the credit?
POLYETHYLENE TEREPHTHALATE (PET)
Pilot-Credits PC11:Chemical Avoidance in Building Materialsposted by Julie Hendricks on
I'm thinking of submitting for this pilot credit with one of my products being a type 6,6 Interface carpet tile (Tectonics).
design phase denial
posted by Keelan Kaiser on
When submitting for a split review what are the options when a credit has been tagged as denied? Can the credit be re-reviewed during construction phase?
multiple-point credit changes between design and construction
posted by Keelan Kaiser on
What happens, hypothetically, when a EAc1 or EAc2 point calculation changes between the time a design credit is marked "anticipated" by the reviewer and the time final construction phase reporting