Forum quick links
Appropriate time for submitting the Preliminary Design Review
posted by Shivani Langer on
What would be the recommended time/phase during a New Construction project when one should submit the preliminary design review?
SSc6.2 form
CS-2009 SSc6.2:Stormwater Design—Quality Controlposted by Michele Otazua on
The credit form for SSc6.2 has apparently changed. The table 1 for TSS has been removed, and in its place a description of BMPs is required. Is this the case?
May 2011 Addenda - CFC Phaseout Plan
CI-2009 EAp3:Fundamental Refrigerant Managementposted by Michelle Ruda on
In the May 2011 Addenda to this credit, the references to a CFC Phaseout Plan have been removed. Specifically: Pg.
Recycling Design Guidelines for large projects
ND-v2009 GIBc16:Solid waste management infrastructureposted by Lauren Sparandara on
I am working on a project with many large buildings (man greater than 600,00 sf). I wanted to advise the client on how much area they should set aside for recycling.
Value input for “Measured outdoor airflow, CFM”
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Patricia Fuertes on
In this prerequisite we are following Case 1 and filling in details in the 2007UM-62MZ Calculator.
Design Engineer signature
CI-2009 EAp2:Minimum Energy Performanceposted by Maria Porter on
In a new build which is undergoing certification in CS and CI simultaneously; what person is the Design Engineer? The person who has to sign in EAp2?
Platinum Certified - Waived Fee
posted by JOSE R. TAGLE on
Hi, I recently certifiied a Platinum LEED Project - "Arquitipo - UNARTE Project ID 1000018199" located in Puebla City, México.