Existing Office Building - LEED CI or EBOM?
posted by Martin Camargo on
We have a project consisting of approximately 8000 square feet of office space that was fully built-out about a year ago.
landscaping changes after Design Preliminary Review
posted by Ryan Carron on
We've had some changes to our site plan since the Preliminary Review and are currently submitting for the Design Final Application.
Do I have to install plumbing fixtures?
ND-v2009 GIBc3:Building water efficiencyposted by Fang Wang on
We have a residential project in China, the owner is interested in getting LEED ND certified.
5th bullet of the Ref Guide
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Marcio Alberto Casado Pereira on
Dear all, We don't quite understand what this means: "An alternative compliance path using FloorScore is acceptable for credit achievement: 100% of the non-carpet finished flooring must be FloorSc
Particulate Matter Removal
NC-2009 IEQp1:Minimum IAQ Performanceposted by Paula Hernandez on
Hi, We are still having problems to install MERV 6 filters upstream VRF evaporators cooling coils, due to the low pressure they can give and luck of enough space to place them. What if we install s
What can we learn?
posted by Marcus Sheffer on
Great job pointing out the questionable issues in the article Nadav! Perhaps I tend to hone in on these issues but one of the big takeaways for me was related to the performance issues raised.
Electric Cigarettes
NC-2009 IEQp1:Minimum IAQ Performanceposted by Andreas M. Roessler on
Dear all, one of our major clients set an interesting question concerning electronic cigarettes. In the building we already certified smoking is not allowed, but could be electronic cigarettes?
Will alterations to entry vestibule qualify for MRc3?
EBOM-2009 MRc3:Sustainable Purchasing—Facility Alterations and Additionsposted by Julie Pollack on
During the performance period for LEED EBOM, the building owner is remodeling the main entrance vestibule to the project building. The vestibule is a separate, enclosed space of 263 sq ft.
Using treated seawater for landscaping
EBOM-2009 WEc3:Water Efficient Landscapingposted by Vincent Kotwicki on
The intent of the credit says "To limit or eliminate the use of potable water or other natural surface or subsurface resources available on or near the project site for landscape irrigation." I ha
What is WEp1-1, plumbing fixture and fitting schedule?
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Diana Hill on
In the summary of the online table it says, Upload WEp1-1.