Forum quick links
Standard bus stop - weekday vs weekend
NC-v4 LTc5:Access to quality transitposted by Felicia Ridgeway on
Can a standard bus stop count if it is within 1/2 mile of the project entrance, or is a standard (non rapid) bus stop only allowed to count towards the 1/4 mile distance credit?
Occupant Comfort Survey
NC-v4 INc1:Innovationposted by Leanne Conrad on
Is there a minimum duration after occupancy you must wait to conduct the occupant comfort survey?
Space types and visitors to be surveyed
EBOM-v4 LTc1:Alternative transportationposted by Jorge Lopez de Obeso on
Hi, in an offices building visitors must be surveyed? The building has sporadic events in common spaces and the visitors rate is irregular.
Occupancy type - transient vs. resident
NC-2009 PIf3:Occupant and Usage Dataposted by Brooke Odom on
We are working on a project for the Navy. It is a facility that acts as a hotel - navy personnel will stay at the facility for a few days until they head to their ship.
Residential Dwelling - Min IAQ Calculator Strategy
NC-v4 EQp1:Minimum indoor air quality performanceposted by RDK E&S on
Hello,
Tenant-owned commercial refrigeration units
CS-2009 EAc4:Enhanced Refrigerant Managementposted by Alexander Aaltonen on
I am working with a LEED CS project.
Emissions Testing - Previous CDPH v1.1-2010 vs. CDPH v1.2-2017
NC-v4.1 EQc2:Low-Emitting Materialsposted by Jennifer Gleisberg on
The low-emitting materials credit was simplified in LEED v4.1, yet the CDPH emissions testing (California Department of Public Health (CDPH) Standard Method v1.2–2017) standard is new.
Exemplary Performance?
CS-2009 EAc1:Optimize Energy Performanceposted by Brian Salazar on
Hello! Is there an Exemplary Performance threshold for this credit?
Project with PV - Calculating Green Power?
CS-2009 EAc6:Green Powerposted by Brian Salazar on
Hello! I am working on a project with on-site PV.