Forum quick links
Non-U.S. Regional Priority Credits for LEED ND
posted by Jaume Albertí on
Hi there, What about regional priority credits outside the US concerning to LEED Neighbourhood Development certification system?
LEED-CI Commissioned system
CI-2009 EAp1:Fundamental Commissioning of Building Energy Systemsposted by Adam Targowski on
LEED-CI Commissioned system I have a question concerning commissioned systems. The office which I would like to certify with LEED CI will have only interior lighting changed.
LEED for Retail - MRp1 Waste Stream Study
posted by Sarah Gaughan on
I am doing projects for both LEED for Retail NC & CI. MRp1 requires a waste stream study. Has anyone done this study yet? Are there specific requirements?
Access to LEED rating EBOM MRc4 form?
NC-2009 IDc1:Innovation in Designposted by Cynthia Ottenbrite on
We are using NC 2009, and looking to document an innovation point following EBOM MRc4: Mercury Reduction.
Case 2 calculator vs. Statement of Energy Performance
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by American University on
When I generate a Statement of Energy Performance for a non-rateable building, the SEP tells me that my building uses 23% less energy per square foot than the national median. 2 points, yay!
WEp1 Form - lav duration and "all fixtures installed >1/1/94"
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Lyle Axelarris on
I have two questions about the LEED Online WEp1 form: 1.
Defining number of parking spaces
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Lisa Sawin on
We have a new office building that is on an Existing VA campus. There are no other LEED projects to date on the campus.
Insufficient Cooling Capacity
NC-2009 EAp2:Minimum Energy Performanceposted by Yoyo Shek on
Dear All, According to 90.1, the HVAC system shall follow the design for proposed case. I wonder what if the HVAC engineer under-sizes the cooling capacity.
MRc5 question:
EBOM-2009 MRp1:Sustainable Purchasing Policyposted by Heather Holdridge on
Does MRc5 count as an alternative to MRc2-4 or not? It seems like it does, however in the MRp1 policy document template it says it doesn't. Could someone please clarify? Thanks!