Forum quick links
MERV13s on VAV boxes
CI-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Michelle Rosenberger on
We continue to struggle with the issue of whether VAV boxes must have MERV13 filters to comply with IEQcr5. VAV boxes do "process return and outside air".
Combined Stalls
NC-2009 SSc4.4:Alternative Transportation—Parking Capacityposted by Curt Pascoe on
I know you cannot double-count between carpool/LEV/FEV to reduce total designated stalls. However, can you combine these stalls if you still provide the same total number? I.E.
annualized daily basis
posted by Melissa Merryweather on
I do apologize if this is already in a comment stream, but I'm not finding it...We've been asked by the reviewers to update our FTEs and the new Pif3 form requires the "daily average calculated on
change LPE info
posted by Jedd Heap on
what was your outcome, i just did the same thing...
75% calculation for Residential projects:
NC-2009 IEQc8.2:Daylight and Views—Viewsposted by Chen Shalita on
We have NC student's campus, with 1700 Residential units.
Urinals in each restroom?
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Marco Abdallah on
Assuming there are 2 separate male restrooms on each floor.
Ban the credit
posted by Bill Swanson on
If the politicians actually meant what they said then all they have to do is ban the GSA from letting any of their buildings to earn this Credit. Problem solved. But no.
Double Skin
CI-2009 IEQc8.2:Daylight and Views—Views for Seated Spacesposted by breeze glazer on
Hello - I am working on an interiors project within a new tower, 1 Bligh St, in Australia. The tower features a double skin facade envelope system.
Template is rounding down to 0 daily uses!
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Marcio Alberto Casado Pereira on
I have a fixture usage group with 4 FTEs and there's a shower in it. Shower daily uses is 0.1, so the template calculates my total daly uses as 0.1 x 4 = 0.4 and it rounds down to 0.