Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Central Plant Chilled Water + Onsite electric HW boiler

NC-2009 EAc1:Optimize Energy Performance
posted by  Ramana Koti  on 

Dear all, I'm modeling an all electric university building that is 32,000 sf/5 floors with chilled water from a central plant and hot water from an onsite electric boiler.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Sep 25, 2012, 3:37 pm
4
LEED AP-ND, Principal
Criterion Planners
LEEDuser Expert
231 thumbs up
Tue Sep 25, 2012, 2:59 pm

Habitat?

NC-2009 SSc1:Site Selection
posted by  Jonathan Weiss  on 

I am working on a project that is the habitat for a state listed species, and the project team has an elaborate mitigation plan to protect the species and nesting areas - post development there wi

3
Sustainability Account Manager
Stok
LEEDuser Expert
177 thumbs up
Tue Sep 25, 2012, 9:33 am

M&V baseline for retrofit?

NC-2009 EAc5:Measurement and Verification
posted by  Eric Longfellow  on 

Hi, we are working on a extensive renovation of a 80,000 SF university classroom/office building using LEED NC 2009.

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Tue Sep 25, 2012, 12:13 am

Faucet Flow Duration

CS-2009 WEp1:Water Use Reduction
posted by  Kevin Short  on 

When calculating for a low-flow fixture, it is required to enter a duration (which is default set to 30 seconds).

3
Mon Sep 24, 2012, 10:51 pm

Decorative Fixtures

CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controls
posted by  Susan M. Kaplan  on 

I know the 'Birds Eye' says that decorative fixtures are not required to be connected to the daylight controls, but I recently received a review comment stating that they must to meet this credit r

2
WW LEED Practice Lead, US Mechanical Department Lead
HP/EYP mission critical facilities
LEEDuser Basic Member
3 thumbs up
Mon Sep 24, 2012, 4:42 pm

EA PR 2

General forums
posted by  Elizabeth Crenshaw Hammitt   on 

Getting rid of the 3rd option is such a huge mistake. I can't believe that the USGBC let the vocal minority win on this one...really disappointed.

32
Mon Sep 24, 2012, 3:30 pm

Lighting for Multifamily High Rise Residential Building

CS-2009 EAp2:Minimum Energy Performance
posted by  Steven Er  on 

Hi, ASHRAE 90.1, section 9 does not apply to lighting within dwelling unit as stated in 9.1.1 footnotes. Table 9.5.1 include LPD allowance for multifamily building.

3
Mon Sep 24, 2012, 2:57 pm

Partially irrigated site

NC-2009 WEc1:Water Efficient Landscaping
posted by  Leah Samson-Samuel  on 

We have a project that is required by convenants to put irrigation on the front and side of the building that faces the street, but not the rest.

3
Default Avatar
LEED AP
ABUD Engineering Ltd.
LEEDuser Basic Member
34 thumbs up
Mon Sep 24, 2012, 7:54 am

rating system for villa in dubai

LEED Rating System Selection
posted by  Muhammad Faisal Azizullah   on 

Hi, i have been approached from one of my clients who is interested in certifying his villa ( G+1) under any rating system.

2
Fri Sep 21, 2012, 8:14 pm