Forum quick links
Environmental Management Systems
posted by Jesse Schildt on
I’m a student researching the perceptions of US construction professionals on the implementation of environmental management systems in construction.
TVOC overall concentration doesn't pass but individual TVOC compounds do pass
NC-v4 EQc4:Indoor air quality assessmentposted by Valerie Johnston on
All of the individual VOC compounds in all sampling locations have passed the LEED criteria.
IAQ Documentation with Corrective Action
NC-v4 EQc3:Construction indoor air quality management planposted by Juanita Garcia on
My project team puts together reports that includes pictures of conditions that to be addressed with SMACNA Control measures and includes photos of corrected conditions.
MERV 8 upstream cooling coils
EBOM-v4.1 EQp1:Minimum Indoor Air Qualityposted by Paula Hernandez on
Hi,
We are working in an EBOM v4.1 project. I have one question.
Fasteners and Misc Materials
NC-2009 MRc4:Recycled Contentposted by Robert Fiala on
To what extent are fasteners and miscellaneous materials expected to be included in Materials & Resources calculations?
COTE Leadership Group needs YOU!
posted by Anne Hicks Harney on
CALL for applications: national COTE Leadership Group
Upcoming NOMA Conference: NOMA Homecoming | Detroit 50 (October 20-23, 2021)
posted by Jarrod Arellano on
Hello all, I would like to share an upcoming Virtual and In-Person conference for NOMA (National Organziation of Minority Architects). Non-members can register, but I encourage anyone to join
LEED project boundary as big as 400m radius
CS-v4 LTc4:Surrounding density and diverse usesposted by Instra Ingenieros on
Dear all,
ASHRAE 90.1 2010 versus ASHRAE 90.1 2016
NC-v4 EAp2:Minimum energy performanceposted by Dave Hubka on
LEED v4.1 allows onsite renewables to contribute to EAp Minimum Energy Performance and offsite Tier 2 renewables to contribute to EAc Optimize Energy Performance.
IS "WELL WATER" AN "ALTERNATIVE WATER SOURCE"?
NC-v4 WEc1:Outdoor water use reductionposted by F. Borja López Calle on
We have a project whose landscape meets the prerequisite “WE Outdoor Water Use Reduction” (it consumes 30% less water than the base case).