Molok Containers for MRp1
CS-2009 MRp1:Storage and Collection of Recyclablesposted by Kristopher Lashley on
We are looking to install a 5000L Molok recycling bin for a LEED 2009 CS building that will be a restaurant. According to the reference guide a 11.6m recycling area would be required.
EV Ready acceptable?
CS-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Dylan Connelly on
For Core & Shell projects - is installing 3% of the parking stalls to be EV ready acceptable to achieve these points?
EAc5 Option 3
NC-2009 EAc5:Measurement and Verificationposted by Sheryl Swartzle on
Our client chose Option 2 on the PIf1 and the form has been approved. They have decided to pursue the 1 point available in EAc5 for choosing Option 1 in PIf1.
Modeling of CHP
CS-2009 EAp2:Minimum Energy Performanceposted by MARCIO OROFINO on
I am working in a project that had a previous consultant and we do not agree with the way the CHP shall be modeled.
Tools for demonstrating solar orientation
Homes-v2008 IDc1:Integrated project planningposted by Erica Downs on
Is anyone aware of any tools for demonstrating the east-west axis of the house is within 15 degrees of due east-west? Or do I need to bust out my protractor?
Can the water content in paint be considered regional?
NC-2009 MRc5:Regional Materialsposted by Maria Porter on
I got a question today that I wasn’t sure of the answer of: Paint contains a large part of water.
Building Area Method & Space-by-Space Method
NC-2009 EAp2:Minimum Energy Performanceposted by VICTOR MORENO on
Hello.
"Landscape = 5% of the total site area" Rule
NC-2009 WEc1:Water Efficient Landscapingposted by Peg Manuel on
I've seen a couple different comment threads on this, so I just want to make sure we're doing the right thing, as we have 5 points pending.
New addition to existing vs. MPR#2
NC-2009 MPR2:Must be a complete, permanent building or spaceposted by maartje van roosmalen on
Existing (all
base and subbase materials
ND-v2009 GIBc15:Recycled content in infrastructureposted by LEEDme Lorenzi on
Road embankment and roadbed must be counted as base and subbase materials? Or only foundation slab and screed? Thank you Strategie