Cx - Warranty Review After Building is Sold

NC-2009 EAc3:Enhanced Commissioning
posted by  Andy Smith  on 

We completed fundamental and enhanced Cx for a building in August of 2016 (with the exception of 10 month warranty review).

1
Thu May 25, 2017, 4:16 pm

LEEDv4- Schools, LTc6 Bicycle Facilities

NC-v4 LTc6:Bicycle facilities
posted by  Karly Michalowski  on 

I have a LEEDv4 for Schools project where all students, staff and facility live on campus. Would dormitory showers count towards this credit?

1
Thu Jun 8, 2017, 1:38 pm

Alternative Compliance Path - C&S LEED Threshold reduction

CS-v4 EAp2:Minimum energy performance
posted by  MKK LEED  on 

Can LEED V.4 C&S projects use the same Alternative Compliance Path (ACP) provisioned for LEED V.3 C&S projects as outlined in the link below?

1
Wed May 24, 2017, 4:58 pm

Table IEQc7.1-1 Design Air Speed at 3 ft ht (ft/min)

NC-2009 IEQc7.1:Thermal Comfort—Design
posted by  Ed Kokosa  on 

I've seen previous versions of this question on the forum and the typical answer is to look at design information provided by diffuser manufacturers. As others have replied back, the standard is to

0

Site Fill as Regional/Recycled Material...

CS-2009 MRc4:Recycled Content
posted by  Rick Alfandre  on 

Looking to confirm: We are using subgrade Fill for our building project that was procured from an on-site location.

1
Sat Aug 26, 2017, 11:09 pm

Regularly Occupied Spaces Consistency Across All Credits

CS-2009 IEQc8.2:Daylight and Views—Views
posted by  Summer Minchew  on 

We provided a sample floor plan of future tenant area to document this credit.

1
Wed May 24, 2017, 12:54 pm

Possible Exclusion??

NC-2009 IEQc8.2:Daylight and Views—Views
posted by  Nate Steeber  on 

My team has a unique project (I suppose most are) - part of it is a cheese processing facility.

1
Wed May 24, 2017, 1:04 pm

Proposed Case-Process Load

NC-v4 EAp2:Minimum energy performance
posted by  Muzammal Abbas LEED AP (BD+C)  on 

Hi, Is there any limitations in LEED V4 regarding process energy that it should be minimum 25% (In proposed case) of the baseline energy cost for the building.

1
Wed May 24, 2017, 4:24 pm

Multifamily Buildings

EBOM-v4 WEp1:Indoor water use reduction
posted by  Zachary Sherman  on 

For multifamily buildings where the residents are responsible for purchasing and installing fixtures, for Option 1 do I need to survey every fixture in every apartment?

1
Tue Jun 27, 2017, 12:15 am

Above ground-floor horizontal exterior spaces (plaza, roof)

NC-v4 SSc6:Light pollution reduction
posted by  Jill Perry, PE  on 

Forgive me if this was covered elsewhere but I couldn't find it.

1
Thu Jun 8, 2017, 2:40 pm