Forum quick links
LIghts pointing upwards
EBOM-v4 SSc4:Light pollution reductionposted by David Lazaro on
Hello, We have a very singular high-rise Project in the city centre.
LCA calculation
NC-v4 MRc1:Building life-cycle impact reductionposted by Emmanuel Pauwels on
1- When performing a LCA calculation for the envelope and structure, not all materials proposed by the design team have an EPD.
Level of detail (cfm) with Trane Trace for LEED -S & L buildings
NC-2009 EAp2:Minimum Energy Performanceposted by Maria Spastri on
Hi all, For the people who have submitted for LEED (v3) using Trane Trace: To what level of detail do you model the heating and cooling cfm and exhaust cfm on room/zone level for large buildings?
Level of detail (cfm) with Trane Trace for LEED -S & L buildings
NC-2009 EAp2:Minimum Energy Performanceposted by Maria Spastri on
Hi all, For the people who have submitted for LEED (v3) using Trane Trace: To what level of detail do you model the heating and cooling cfm and exhaust cfm on room/zone level for large buildings?
Number of Products
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Ashley Hu on
Hello there, For option 1, how many products would a workstation, with a privacy screen and storage attached be considered?
Workstation Components and C2C Certification
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Ashley Hu on
Hi there! Some Cradle to Cradle (C2C) certifications notes exclusions.
Applicability of LEED NC v4 Rating System
NC-v4 MPR1:Must be in a permanent location on existing landposted by sriram tetali on
Hi All, The Situation is as follows. Project is registered under LEED 2009 v3, whose Final review is completed, and now client is planning to Refurbish, Reorient or Relocate some of the Major/Minor
Site Management Policy but No Landscaping
EBOM-v4 SSp1:Site management policyposted by Nitesh Kumar J on
I'm looking for some guidance regarding Site management policy. There is no scope of landscaping or soil in the existing site, then how do we attempt this prerequisite.
Entryway mats
CS-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Anna Korinkova on
Hi everyone, please do you know whether entryway mats - roll out or stabile have to be Green Label certified as carpets?
LEED ID&C EAc1.3
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Dave Cale on
I am pursuing this credit under option 2. My client has bought a 9 story building and the project in question is for 2 partial floors and three full floors.