We have a CS project that proposes a facade lighting that will be installed inside the building (which is at tenant office space areas). This lighting system will be provided and controlled by the building management.
My understanding is that although it is intended for lighting building facade, since it is placed indside tenant office space areas, the power consumption of the design facade lighting will be included in the calculations and requirements for interior offices lighting power density. Is this correct?
Add new comment
To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.