Forum quick links
Do materials in building services count as 'permanently installed'?
NC-v4.1 MRc3:Sourcing of Raw Materialsposted by Cecilia Lopez-Cotarelo on
Do the materials used in the building services count a permanently installed materials when calculating the costs?
Waste Stream Audit AFTER Performance Period?
EBOM-v4 MRp1:Ongoing purchasing and waste policyposted by Heather Enos-Graves on
Once the performance period closed for our project, we realized that we did not divert 75% of ongoing waste as required by the prerequisite.
Does wallcoverings considered a "PRODUCT" by LEED?
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Sara BENLOUBA on
Hello everybody,
Indoor Water Use Reduction Calculator v4.0
NC-v4.1 WEp2:Indoor Water Use Reductionposted by Dung Bui on
Hi everyone,
I'm currently working on the credit Indoor Water Use Reduction (Calculator 4.0 excel sheet) and have a question concerning fixture's design flow rate.
Does wallcovering considered a ''PRODUCT" for LEED V4?
NC-v4 MRc4:Building product disclosure and optimization - material ingredientsposted by Sara BENLOUBA on
Hello everybody,
Entryway system and fire security
Warehouses-NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Helena Garcia on
The project is a warehouse divided in two parts: storage and offices.
Safety First & WELL Health + Safety Crossover
Pilot-Credits INpc155:Design for Indoor Air Quality and Infection Controlposted by Patti MacKenzie on
We are attempting INpc155 on a v4.1 CI project, we are also planning to obtain the WELL H+S rating so this credit was an easy crossover for us.
Question about Option 4. Parking Under Cover
EBOM-v4 SSc3:Heat island reductionposted by J.W. Shin on
We are working on a LEED O+M: existing building project with a multilevel parking space (10th floor mechanical parking) attached to the main building.