Log in
Forum » Pilot-Credits PC20
Topic

Insulating Concrete Forms

Pilot-Credits PC20: Recycled Content
posted by AMY VAN DAM on Mar 13, 2014, 1:04 pm

Our project is using insulating concrete forms (ICFs) for the wall...

What about for an initial interior fit-out?

Pilot-Credits PC20: Recycled Content
posted by Habitech Distretto Tecnologico Trentino on Apr 14, 2011, 11:06 am

Hello all.
I am working on a LEED-CI project.
The situation is an initial interior fit-out (build-out of areas where there are no existing interior walls, finishes, etc.) and the...

Last reply: Juan Ramos, Nov 8, 2011, 7:13 pm

Credit Closing in July

Pilot-Credits PC20: Recycled Content
posted by Batya Metalitz on Jun 2, 2011, 11:21 am

This credit will be closing in July 2011, with the launch of the LEED 2012 2nd Public Comment period. The credit will be replaced with a new materials related credit that will be added to the...

Last reply: Batya Metalitz, Jun 16, 2011, 1:38 pm

Closed-loop Recycling and Take-back Program Definition

Pilot-Credits PC20: Recycled Content
posted by Joseph Chambliss on Jan 5, 2011, 2:50 pm

How will the USGBC define the term "closed-loop recycling"? Businessdictionary.com defines closed-loop recycling as a "Production system in which the waste or byproduct of one process or product...

Last reply: Batya Metalitz, Jan 5, 2011, 5:42 pm