Forum quick links
Waste Audits: How To
CI-2009 MRp1:Storage and Collection of Recyclablesposted by Hernando Miranda on
In 2002 I reviewed an excellent waste management study and developed a draft compression of the results.
Other Services ?
NC-2009 SSc2:Development Density and Community Connectivityposted by Rick Ferrara on
I find it odd that a hotel is not listed as an amenity. Does anyone have any history with getting this accepted? What about a gas station and nursery? (The kind with plants, not children).
Energy Star classifications
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Maria Vasapollo on
Would a college building -full of classrooms, with 1 auditorium go under "Office" or does Energy Star simply not have a category for us?
How to calculate %
CS-2009 EAc2:On-site Renewable Energyposted by Emmanuel Pauwels on
The reference for the calculation is total energy cost. The output of an array of PV panels is in kwh.
ASHRAE 90.1 Exit signs - Mandatory Provisions
CS-2009 EAp2:Minimum Energy Performanceposted by Bernadette Stauder-Buschlinger on
In the CS- project the exit signs are considered to be a part of the emergency lighting. Therefore the lamps are off during normal operation. The proposed exit sign exceed 5 W per face.
Example of Thermal Calculation ?
NC-2009 IEQc7.1:Thermal Comfort—Designposted by Eric JS on
Dear all, Do you have any example of thermal comfort calculation to satisfy this credit? Thanks and cheers!
Need details for each room?
NC-2009 IEQc5:Indoor Chemical and Pollutant Source Controlposted by Maura Adams on
The review team said we need to highlight and more specifically document the compliance measures for chemical usage areas.
suggestions
posted by Bill Swanson on
1) Do the same process and claim the projects back. I wonder how many times it can change back and forth before someone at GBCI would notice.
LEED Project Boundary Changes
posted by Daniela Castro Salgado on
We have a project for which we are about to submitt precertification documentation. There were changes to the original project boundary because the street will be widened.