Forum quick links
Entries - Definition
EBOM-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Mario Kranzl on
"Prohibit on-property smoking within 25 feet of ENTRIES, outdoor air intakes and operable windows." I didn't found a definition, which entries are meant?
Steel
Schools-2009 MRc5:Regional Materialsposted by Jose Martinez on
For steel products, would the extraction location be the mill where it is produced?
Elevated Air Speed
CI-2009 IEQc7.1:Thermal Comfort—Designposted by Natalie Terrill on
Anybody else having a problem with elevated air speed (over 40 fpm)? I have a commerical office building with ceiling diffusers with 60 fpm and the credit has been audited for elevated air speed.
USGBC Overhauls Demand Response Pilot - in Response to Critics
Pilot-Credits EApc8:Demand responseposted by Tristan Roberts on
My colleague Nadav Malin has been investigating this credit and just wrote up the following about it, which he emailed to me:
WEp1- Kitchen Sink for Cafeteria
CI-2009 WEp1:Water Use Reduction—20% Reductionposted by Sharon Chen on
I am working on a LEED CI project. It’s an office building with kitchen sinks in pantry areas throughout the building, which is available for all the occupants.
Smoking areas
CS-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by charles bell on
We prohibit smoking in our office buildings, but have a central plaza which will provide designated smoking area. Question: does that designated smoking area need to be covered? Thanks!!
One single treatment plant for two LEED projects
NC-2009 WEc2:Innovative Wastewater Technologiesposted by Michael E. Edmonds-Bauer on
We have a project in which site two independent buildings will apply for LEED certification.
Weighted calculation - lower SRI value
CS-2009 SSc7.2:Heat Island Effect—Roofposted by LEED Pro Consultant on
Hello! We have a project in which the client will install a roofing material with an SRI value of 70 (low slope: requirement-78) for 100% of the roof area. Can this be compliant with this credit, u
Incorporating LEED interpretation to SSc5.1
CS-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Phil Meyer on
Hi all, I have a question regarding a recent LEED interpretation citing SSc5.1.
Shower/Changing Room not Required?
CS-2009 SSc4.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Marci Schreiber on
Our CS project has 66 FTEs. When I completed the SSc4.2 template on-line it automatically populated the "number of showers required" as "0". Can that be correct?