Forum quick links
Categorizing a LEED project
posted by Adi Negara, LEED AP BD+C on
Hello all, I have a difficulty in determining the appropriate LEED rating system for a project, and I hope that you all can tell me what rating system is best suited to the project: The project ow
LEED NC or EBOM ?
posted by Fabio Frescia on
Hi, We just got a project here in Thailand that just started, where our client would like to achieve a LEED certification. It's an existing resort and they want to renovate it.
District cooling system with different construction planning
NC-v4 EAp2:Minimum energy performanceposted by Jeroen Sap on
I have a project at hand with a high LEED ambition. They have the opportunity to connect to a future district cooling system (high efficiency).
Car Dealership
NC-2009 SSc4.3:Alternative Transportation—Low-Emitting and Fuel-Efficient Vehiclesposted by Robert Shields on
We are working on a project to build a Toyota Dealership in Pennsylvania and the owner is seeking LEED Certification (LEED 2009).
Project Specific Questions
CI-2009 MRc1.2:Building Reuse—Maintain Existing Interior Nonstructural Elementsposted by Lauren Sparandara on
Please help advise for these two questions.
School project - Group certification
posted by Maya Karkour on
Hello, we are working on a new K12 school project with 4 separate buildings (2 bldgs for classrooms, 1 administration and 1 sports center).
Rainwater storage tank TSS removal efficiency
NC-2009 SSc6.2:Stormwater Design—Quality Controlposted by Manuel Martin Delgado on
Hi. We have designed a rainwater storage tank for dirty rainwater, with a bigger capacity than required. The water, after being storaged for a while, is pumped to the local sewerage system.
Naturally ventilated corridors
NC-2009 IEQp1:Minimum IAQ Performanceposted by Stella Stella on
In one of our project we have a Main corridor that is completely open with just a parapet wall and roof overhang. Now we have another small corridor that is connected to this Main corridor.
Non-motorized rights-of-way
Pilot-Credits PC14:Walkable Streetsposted by Florian Schmidtchen on
We have a building located in a pedestrian area. The only "street frontage" faces directly to this 20 m wide area.
farmers
Pilot-Credits SSpc82:Local food productionposted by Matthew VanSweden on
Out of curiosity, has anyone in pursuit of this credit or in its development talked to an actual farmer [or grower]?