Forum quick links
No mention of Private offices
CI-2009 EAc1.2:Optimize Energy Performance—Lighting Controlsposted by Edgar Arevalo on
Can we still include private offices that have occupancy sensor controls. Under the drop down space type menu, it only mentions shared office.
SS - EM
NC-2009 EAc1:Optimize Energy Performanceposted by SSN Energy Model on
Dear All, I am doing Energy Model for Shopping Mall Project. Currently, I am working for Proposed Case. As per the design, the proposed system is 10 no of VRF with COP 3.8.
Definition of fried
posted by Dionisio Franca on
Hi! Under no 38 - Fruits and Vegetables we have "At least 50% of available options are fruits and/or non-fried vegetables." Does fry here includes stir-fry?
documentation
NC-v4 MPR1:Must be in a permanent location on existing landposted by sepideh khodadadi on
i am working on a big project and have absolutely no experience in LEED .
Which version of LEED forms to use.
NC-2009 IEQp1:Minimum IAQ Performanceposted by VEL MUTHU on
We are working on a project which was registered under V3 on 2015 and still running. My doubt is the the online form is updated from version to version.
LEEDv4 compliant operable partitions?
NC-v4 EQc2:Low emitting materialsposted by Joanna Switzer on
Has anyone had luck in locating CPHv1.1-2010 tested (or alternately Green Guard Gold certified) operable / folding (CSI Division 10) partitions? As a general observation, I am concerned numerous s
How to define affordable housing : rental and for-sale
ND-Plan-v4 NPDc4:Housing types and affordabilityposted by William Gagnon on
Hello, How do we define principal, taxes and insurance (PITI) in Step 4.' Compute Maximum Pricing'? Should we get in touch with a bank and ask for mortgages rates?
PC 112 Calculating costs
posted by Maki San Miguel Paulson on
The requirement is to use 25% by cost, of the total value of permanently installed products in the project.
Converting Inches to volume of rainfall
EBOM-2009 SSc6:Stormwater Quantity Controlposted by Mihir Parikh on
Does anyone have an accurate way of converting total inches of rainfall to cubic feet as required by the credit?
phases of project & VOCs
NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealantsposted by Debra a. Lombard on
we are a GC working on a project that is the renovation of a historic bldg and that renovation started a very long time ago '(about 3 yrs ago) and about a year before the project was registered for