LEED for Homes framing with light-gauge metal
Mid-Rise-v4 MRp2:Durability managementposted by Robyn Vettraino on
Does anyone know of any interpretations in the LEED-H Midrise regarding the MR1.2, Detailed Cut List and Lumber Order, when you aren't using lumber, but using light gauge framing instead.
LEED CI proposal
CI-2009 EAp2:Minimum Energy Performanceposted by Fabio Frescia on
Hi all, I am about to prepare a proposal for a client that wants to renovate his 2 story office inside a 20 years old building and he wants LEED CI certification. Do I need to include an energy sim
Multiple Buildings Project Certification
CS-2009 PIf1:Minimum Program Requirementsposted by Mario S. on
We have a project with 3 buildings located on the same plot, that are physically attached by two underground levels made up of technical rooms, parking spaces, bicycle racks, showers and garbage ro
3.2 at a Group Project
CI-2009 SSc3.2:Alternative Transportation—Bicycle Storage and Changing Roomsposted by Russell Remy on
I currently have a group project LEED-CI in which one building has changing facilities and showers meant for both building tenants use.
Utility sells "Community Solar" in yearly blocks - NOT Green-e
NC-2009 EAc6:Green powerposted by Joyce Kelly on
The local Utility sells "Community Solar" in yearly blocks - is NOT yet Green-e certified but willing to provide all the data required to be Green-e certified.
DOE Case Study - website?
posted by Peg Manuel on
In the past, the following website was an excellent place to upload a case study: US Department of Energy's Federal Energy Management Program "High Performance Federal Buildings Database" http://
the documentation language
NC-2009 SSc1:Site Selectionposted by ESRA OZKONUKSEVER on
hi everyone, working on a project outside of U.S. I ve gathered the necessary equivalent documentation for this credit but it s all in the local language.
Existing Blow-out toilets
CI-2009 WEc1:Water Use Reductionposted by Russell Philstrom on
Our project is in a 57-story building where the existing toilets are original to the building (1972) and are blow-out toilets at 3.5gpf.
Scope of the Pre-requisite in C&S Shopping mall
CS-2009 IEQp1:Minimum IAQ Performanceposted by Alan Viale on
We are working on a new shopping mall. as usually in my country, a anchor store (tenant deparment store) was first developed and constructed and now is operating.
Scope in a C&S shopping mall
CS-2009 EAp2:Minimum Energy Performanceposted by Alan Viale on
We are working on a new shopping mall. as usually in my country, a anchor store (tenant deparment store) was first developed and constructed, and now is operating.