Water Use Reduction

Schools-2009 WEc3:Water Use Reduction
posted by  Karly Michalowski  on 

I have a Daycare center that's pursuing LEED-NC v2009. There are a couple of "changing room stations" that have sinks. Would these be classified as kitchen sinks or lavatory sinks? thanks!

1
Sun Aug 27, 2017, 12:14 am

Roof for School

Schools-NC-v4 EQc2:Low emitting materials
posted by  Josh Inge  on 

If you are trying to achieve the Schools–NC-v4 EQc2: Low emitting materials does the type of roof you use matter ?

0

Joint Compound

Schools-2009 IEQc4.6:Low-Emitting Materials—Ceiling and Wall Systems
posted by  Michele Helou  on 

Joint Compound? Is it a sealant for IEQc4.1 or part of the wall system for IEQc4.6?

0

what type of document required uploading to LEED ARC

Discuss the LEED Dynamic Plaque and Arc
posted by  Subrota Roy  on 

Hi, For existing building LEED certification which type of data/document required upload to LEED ARC & what will be the timeline & process ? If any example it will be very good for me.

0

VRF System Computation

NC-2009 EAc4:Enhanced Refrigerant Management
posted by  Katherine Mariano  on 

Hi All, I just want to ask if the pre-charge or additional charge of the VRF system is included on the computation for Rc (Refrigerant Charge). Thanks!

1
Tue Jun 6, 2017, 3:25 pm

EPDM tile and Wood Porch

Schools-NC-v4 EQc2:Low emitting materials
posted by  Emmanuel Pauwels  on 

We are looking for compliant materials for a School project. Regarding exterior applied products, it seems, that just "applied on site" must be compliant (Adhesives, sealants, coatings, roofing, a

1
Wed Jun 21, 2017, 2:53 pm

Treatment of Outdoor Air for Incomplete Spaces

NC-2009 EAp2:Minimum Energy Performance
posted by  Joseph Chappell  on 

I recently received LEED review comments regarding the treatment of incomplete space in an energy model for a proposed new construction building.

1
Tue May 30, 2017, 8:24 pm

Outdoor air delivery monitoring system for evaporative cooler

NC-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Gopinath Vasu  on 

For projects served by evaporative cooler which is supplying 100% fresh air to conditioned spaces, is it still require to have an outdoor air delivery monitoring system. Even though at minimum flo

1
Wed May 31, 2017, 1:44 pm

Atrium with reception desk

CS-v4 EQc4:Daylight
posted by  Martin K  on 

Hi, can someone help me please with these questions? 1) we have an atrium space with a reception desk in the middle.

0

Over limit adhesive used while building is open

CS-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Jayme Antolik  on 

I am on a project where the contractor used an adhesive that exceeds the VOC limit for that type but the building was open when they used it.

1
Fri Jun 2, 2017, 12:47 pm