Forum quick links
PI FORM 3 Version 4: Complex Occupancy
NC-2009 PIf3:Occupant and Usage Dataposted by Curtis Clark on
Under "Complex Occupancy", it states to upload "PIf3-1" to calculate FTE. Is this a spreadsheet that we create or is there on on-line form?
Exterior LPD for Block Project
NC-2009 EAp2:Minimum energy performanceposted by Katherine Ann Resurreccion on
We registered a block project; the Campus boundary includes land scape, existing non-LEED buildings and two LEED certification candidate buildings.
Project Information (PI) forums
posted by Tristan Roberts on
LEEDuser now has a dedicated set of forums, including sample documents, for Project Information forms.
Exemplary performance for offsite land
CS-2009 SSc5.1:Site development - protect or restore habitatposted by Heather Holdridge on
We are planning to donate offsite land to a land trust to gain earn this credit. This land will be equal to more than 75% of the previously developed area (including the building footprint).
Temporary purposes
CS-2009 MRc6:Certified woodposted by Heather Holdridge on
The credit language mentions that the project team can include the FSC certified wood used for temporary purposes such as framing, scaffolding, etc. in the calculation.
Lighting power density of a Clinic
NC-2009 EAp2:Minimum energy performanceposted by Rodrigo Dias on
Hello I'm working in a energy simulation of a medical clinic, where it is possible to make some types of exams and diagnoses, but it doesn't have spaces like intensive care or surgical areas.
LEED credit achievement
posted by Tristan Roberts on
Credit achievement rates can now be found through the Green Building Information Gateway, at GBIG.org.
site boundary forum - MPR3
posted by Tristan Roberts on
Good news for site boundary questions—LEEDuser now has a dedicated forum for MPR3, with guidance on that page that helps address many questions.
LEED Certification in an existing artificial island
posted by Joshua ADY on
We have a Project in an existing artificial/man-made island with a fully developed infrastructure.
Types of alerts for OA monitoring
NC-2009 IEQc1:Outdoor air delivery monitoringposted by Devani PERERA on
Until now, I have only seen monitoring systems connected to a BMS that generates an alert to the Facility Manager.