T2, T4, T6

Healthcare-v2009 MRp2:PBT source reduction - mercury
posted by  Gustavo De las Heras Izquierdo  on 

This credit does not allow installing T9, T10 or T12 fluorescent lamps. This credit provides a criteria to specify T5 and T8 fluorescent lamps. Are there any requirement for T2, T4 and T6 fluores

2
Fri Mar 14, 2014, 5:59 pm

Mech. exhaust fans required for a naturally ventilated project?

CS-2009 IEQp1:Minimum IAQ Performance
posted by  Ron Dean  on 

I'm working in a small project with natural ventilation overall. Considering these 3 facts: 1. LEED states to comply with sections 4-7 of ASHRAE 62.1-2007. 2.

2
Representative
Vermont House of Representatives
LEEDuser Expert
7780 thumbs up
Fri Mar 14, 2014, 4:19 pm

LEED CI 2009 M&V metering requirements

CI-2009 EAc3:Measurement and Verification
posted by  Patrick Salmon  on 

Our company is in the process of determining whether a commercial interiors project is ideal for the EAc3 submetering option for Case 1.

3
Default Avatar
EIT, LEED AP BD+C
Highland Associates
LEEDuser Basic Member
0 thumbs up
Fri Mar 14, 2014, 3:28 pm

Tenant space fan & pump sizing

CI-2009 EAc1.3:Optimize Energy Performance—HVAC
posted by  Mike D  on 

We are a bit confused as to the meaning of space fan and pump sizing? Could anyone please offer some clarification? Thanks!

9
Default Avatar
LEEDuser Basic Member
45 thumbs up
Fri Mar 14, 2014, 3:16 pm

Dormitories - LEED NC?

LEED Rating System Selection
posted by  Maya Karkour  on 

Hi All, This international project consists of several 3 stories dormitories.

8
Fri Mar 14, 2014, 7:55 am

Air flow measurement for non densely occupied zones

NC-2009 IEQc1:Outdoor Air Delivery Monitoring
posted by  Magda Aghababyan  on 

Dear Sir/ Madam, I have a project that is a hotel with 200 guest rooms that are non-densely occupied. Each guest room floor (20 rooms per floor) is supplied with 3 AHUs.

6
Fri Mar 14, 2014, 3:47 am

Metering domestic hot water for kitchen - exemplary point in WEc

EBOM-2009 WEc1:Water Performance Measurement
posted by  Tom Kennedy  on 

Our project is a large office building with commercial kitchen (in house breakfast/lunch, etc).

2
Director - Green Building Advisory
Colliers International Ltd.
LEEDuser Basic Member
201 thumbs up
Fri Mar 14, 2014, 1:44 am

LEED Review clarification

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  Craig Wilson  on 

Quick question that I’m hoping you can help me with. When you submit credits and LEED comes back with a review, is that the first and only review?

2
LEED AP BD+C, O+M, Green Globes Professional
JLL
LEEDuser Basic Member
112 thumbs up
Thu Mar 13, 2014, 10:05 pm

Revisions to design submittal during CD submittal

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  PATRICK HILLIER  on 

As part of my CD submittal response - that had corrections to my design submittal final - there were files that I was fairly certain I had uploaded but the response was "no new information was subm

6
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Thu Mar 13, 2014, 3:37 pm

Exactly at silver - can you add points after construction final?

LEED Reviews: Appeals, Design/Construction Submittals, and more
posted by  PATRICK HILLIER  on 

Based on my CD review comments and current estimates I am exactly 50 points for silver (2009 NC). If in our final review we miss any points we will not make silver.

4
Energy Program Specialist
PA DMVA
LEEDuser Expert
626 thumbs up
Thu Mar 13, 2014, 3:17 pm