Healthcare-v2009 MRp2:PBT source reduction - mercuryposted by Gustavo De las Heras Izquierdo on
This credit does not allow installing T9, T10 or T12 fluorescent lamps. This credit provides a criteria to specify T5 and T8 fluorescent lamps. Are there any requirement for T2, T4 and T6 fluores
Mech. exhaust fans required for a naturally ventilated project?
CS-2009 IEQp1:Minimum IAQ Performanceposted by Ron Dean on
I'm working in a small project with natural ventilation overall. Considering these 3 facts: 1. LEED states to comply with sections 4-7 of ASHRAE 62.1-2007. 2.
LEED CI 2009 M&V metering requirements
CI-2009 EAc3:Measurement and Verificationposted by Patrick Salmon on
Our company is in the process of determining whether a commercial interiors project is ideal for the EAc3 submetering option for Case 1.
Tenant space fan & pump sizing
CI-2009 EAc1.3:Optimize Energy Performance—HVACposted by Mike D on
We are a bit confused as to the meaning of space fan and pump sizing? Could anyone please offer some clarification? Thanks!
Dormitories - LEED NC?
posted by Maya Karkour on
Hi All, This international project consists of several 3 stories dormitories.
Air flow measurement for non densely occupied zones
NC-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Magda Aghababyan on
Dear Sir/ Madam, I have a project that is a hotel with 200 guest rooms that are non-densely occupied. Each guest room floor (20 rooms per floor) is supplied with 3 AHUs.
Metering domestic hot water for kitchen - exemplary point in WEc
EBOM-2009 WEc1:Water Performance Measurementposted by Tom Kennedy on
Our project is a large office building with commercial kitchen (in house breakfast/lunch, etc).
LEED Review clarification
posted by Craig Wilson on
Quick question that I’m hoping you can help me with. When you submit credits and LEED comes back with a review, is that the first and only review?
Revisions to design submittal during CD submittal
posted by PATRICK HILLIER on
As part of my CD submittal response - that had corrections to my design submittal final - there were files that I was fairly certain I had uploaded but the response was "no new information was subm
Exactly at silver - can you add points after construction final?
posted by PATRICK HILLIER on
Based on my CD review comments and current estimates I am exactly 50 points for silver (2009 NC). If in our final review we miss any points we will not make silver.