Using v4 NPDc5 on LEED ND v2009
ND-v4 NPDc5:Reduced parking footprintposted by Gwen Corrie on
We have a registered LEED ND v2009 project. Our SSLc4 does not comply (we are shy of the needed short-term bike racks and showers).
LCA and EPDs
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by NESLIHAN AKSOY on
Buildings LCA is conducted to measure the impact of building materials..as well as building use etc.
Are GoO fulfilling EAc6 credit?
NC-2009 EAc6:Green powerposted by Francesco Allaix on
GoO (Guarantees of Origin) are European equivalent to United States' REC.
Best Methods for Conducting a Drawing Review
posted by Melissa Estrada on
My sustainability consulting firm has been conducting the con docs (drawing) reviews for our clients for LEED compliance, but the method we have been using is not the most streamlined.
cradle to gate scope?
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Erin Holdenried on
Does the compliance with the ISO 14025 standard automatically include cradle to gate scope? Or is the scope stated separately in the product EPD?
Integrative Process (IP) Guide 2.0
NC-v4 IPc1:Integrative processposted by Vitor Tosetto on
Please, someone knows where can I buy the Integrative Process (IP) ANSI Consensus National Standard Guide© 2.0? In ANSI's webstore I found v1.0 only.
Building footprint
NC-2009 PIf2:Project Summary Detailsposted by Heather Holdridge on
Should the footprint of the project building include covered walkways, porches, etc?
New to LEED-ND...submitting for certification
ND-v2009 PIf1:Development Program and Site Typeposted by Courtney Royal on
Hello, My first question is, if Stage 3 is the only stage in the process that will garner an actual certification level for the development, then what are the benefits of also registering under St
n/a
NC-v4 SSc4:Rainwater managementposted by Anastasia Makarenko on
Dear all, we're planning to install tank for collecting 180% of stormwater from 95 percentile rainfall event.
Project is 1 building, waste is from 3 buildings
NC-2009 MRc2:Construction Waste Managementposted by Melissa Merryweather on
I have a building located in a campus. Only the office tower is undergoing LEED certification but all 3 area being built concurrently.