EBOM-v4 WEc3:Cooling tower water useposted by Robert Cox on
Hello - Based on the water analysis provided by our vendor, we can achieve 11 cycles prior to requiring treatment. We are currently using 10 cycles. Does this qualify for 2 or 3 points?
Water metering for Fire safety
Retail-NC-v4 WEc4:Water meteringposted by ilenia ottati on
Does water meter for fire emergency counts as additional meter for process water? In our project a tank is filled with water coming from municipal facility.
Monitoring VRF unit
CS-2009 EAc5.1:Measurement and Verification—Base Buildingposted by Edmée Knight on
We are installing an air cooled VRF system with a DOAS in our building.
Outdoor Airflow Measurement Device in AHUs
Schools-2009 IEQc1:Outdoor Air Delivery Monitoringposted by Thomas Kohmann on
There are a few AHUs in the project for which I work. One AHU supplies less than 20% of the non-densely-occupied rooms with its air volume flow, but still has outdoor airflow measurement devices.
Minimum Indoor Air Quality Performance Calculation
NC-v4 EQp1:Minimum indoor air quality performanceposted by Amal Venugopal on
My Project has one FAHU on roof which is supply treated Fresh air to all AHU"s, And each AHU further supplies the mixture of outdoor air and Recirculated air to various zone via VAV (no reheating,
VOC emissions certificate
NC-v4 EQc2:Low emitting materialsposted by Charline SEYTIER on
We received a LEED approved certificate concerning VOC emissions for Polyethylen Foam products.
What is the baseline assumption for this credit?
CI-v4 IPc1:Integrative processposted by Betty Liu on
Hi All, We are designing a CI v4 office space in an existing high-rise building.
Public Shuttle to Ferry/Rail
NC-v4 LTc5:Access to quality transitposted by Kristen Magnuson on
I know private shuttles do not count, and the LEED credit language emphasizes walking distance; however, can you count the trips at a ferry station and train station that are accessible through pub
EAc1 Space Cooling and Heating
NC-2009 EAc1:Optimize Energy Performanceposted by Mark Rawson on
Hello, When I generate the EAc1 Summary Report in HAP I have a negative percent savings in space cooling and heating in the performance rating table.
Option 3 - strategy 2
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Gail Napell on
The credit language reads: Design at least 50% of interior nonstructural walls, ceilings, and floors to be movable or demountable.