Building's equipment still uncertain
NC-v4 EAc3:Advanced energy meteringposted by Maria Matos on
Hi Marcus, We are working on a building which will have the following uses: offices, laboratory (pharmaceutical), showers and changing facilities, canteen and a smaller bar.
Power generator
NC-v4 EQc9:Acoustic performanceposted by Alicja Bieszyńska on
Does this credit take power generators into account? It's not a HVAC equipment, however it's quite loud...
Meeting room ID+C: CI certification
CI-v4 MPR3:Must comply with project size requirementsposted by Silvia Ruiz on
Hi A client asked us if they can earn a LEED ID+C: CI certification for a 968 sqft meeting room renewal.
Exclusion of Athletic Fields?
Schools-2009 SSc5.1:Site Development—Protect or Restore Habitatposted by Kimberly Schlaepfer on
Hi, We have a schools project with a large athletic field on site.
Existing building structure to be acquired and then certified.
NC-v4 MPR1:Must be in a permanent location on existing landposted by Guillermo Brunzini on
One of our clients is acquiring a recently finished concrete structure for a new development and wants to know the feasiblity of getting a LEED certification. The original concrete structure to be
Baseline system for hybrid service hot water system
NC-2009 EAp2:Minimum Energy Performanceposted by Vernon Smith on
Our Proposed project (LEED 2009 NC) has a hybrid service hot water system that uses a water-source heat pump as the primary hot water generator and has a heat exchanger as a backup downstream of t
Qualifications for ID+C rating system
CI-v4 MPR2:Must use reasonable LEED boundariesposted by Mercedes Ferreira on
Does the project building need to be a rented space in order for it to fall under the ID+C rating system?
Engaging the CxA
CI-v4 EAp1:Fundamental commissioning and verificationposted by Jeni Panars on
This pre-requisite requires the CxA be engaged by the design development phase. The client for the project I am working on did not decided to pursue certification until 100% design.
Existing small HVAC&R units
CI-v4 EAp3:Fundamental refrigerant managementposted by Mercedes Ferreira on
For the Fundamental Refrigerant Management credit under the ID+C rating system, when the requirement says, "Existing small HVAC&R units (defined as containing less than 0.5 pound (225 grams) of
Baseline Case Selection
NC-2009 EAp2:Minimum Energy Performanceposted by SAMY Chamy on
Dear All:- Our project consist of 4 floors but Air conditioning area is less than 25000 so it is confuse us to select base case system so please help us in selecting base case system Heating sour