NC-v4 EAp2:Minimum energy performanceposted by K Nakamura on
Is there any special considerations for a project registered (v2.2) and designed 10 years ago is now being constructed. V2.2 and v2009 have expired so we need to register it for v4.
Building facade facing circulation network not more than 1ft
ND-v4 NPDc1:Walkable streetsposted by Kristina Pobre on
I'm a bit confused with why LEED ND is putting a point on this specific criteria.
Zero lot line
EBOM-v4 SSc5:Site managementposted by Lawrence Lile on
Can a zero lot line building achieve this credit?
Does FloorScore apply to subfloor surfaces?
CI-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Edgar Arevalo on
I have a project where I received a submittal for a subflooring hard surface material.
Portable Basketball Floor
NC-2009 IEQc4.3:Low-Emitting Materials—Flooring Systemsposted by Summer Minchew on
Would a portable basketball floor be considered not "permanently installed" and therefore not subject to credit requirements?
Informal Bus Services
NC-v4 LTc5:Access to quality transitposted by Ben Pratt on
I am working on a project in Beirut where there is a lack of municipal public transit options - thus making it a challenge to target this credit.
Individual user adjustments: NON-permanent interior obstruction?
NC-v4 EQc8:Quality viewsposted by Greg Romanczyk on
We have an open office with 42” H workstations and are pursuing the v4 Quality Views credit.
University Campus with Solar, not in Project LPB
CI-v4 EAc4:Renewable energy productionposted by Sara Zoumbaris on
Our project is the renovation of an existing university building.
electrical and plumbing in pre construction meeting
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by filomena nigro on
if I need to do a pre construction meeting kick off, what is the involvement of electrical and plumbing at the stage of excavation?
Energy Effiicency Measures
CI-v4 EAc2:Optimize energy performanceposted by Kalyan Nishtala on
Under option one for compliance (energy simulation), which measures can credit be taken for?