Interior Lighting for 24 operation
NC-2009 SSc8:Light Pollution Reductionposted by Erin Holdenried on
Can compliance with the following requirement also be documented by proving (through interior lighting contour drawings) that less than 10% or the initial fixture lumens will be transmitted through
Facade Lighting
NC-2009 SSc8:Light Pollution Reductionposted by Maria Kutelova on
Our project has issues with the lighting on one of the facedes that exceeds the LPDs per ASHRAE.
Interior Lighting_24-hour operation project
NC-2009 SSc8:Light Pollution Reductionposted by Seunghyun Cha on
Hi, I'm working on a LEED v3 project and We have an issue complying with this credit. Our project is basically a 24-hour operation project, however, some spaces do not operate for 24 hours such as
CALGreen Light Pollution Bulletin
NC-2009 SSc8:Light Pollution Reductionposted by Lauren Sparandara on
This note is for CALGreen but thought I'd share anyway. The Light Pollution credit under CALGreen is now considered voluntary until July 1st.
Existing Site Lighting Fixtures
NC-2009 SSc8:Light Pollution Reductionposted by Ronnie Lynch on
I am currently working on a project where we are renovating the interior of a building.
Using the centerline as the "site boundary"
NC-2009 SSc8:Light Pollution Reductionposted by Zachary Guren on
The requirements state that for all zones: "Illuminance generated from a single luminaire placed at the intersection of a private vehicular driveway and public roadway accessing the site is allowed
Excluding areas for healthcare
NC-2009 SSc8:Light Pollution Reductionposted by Jaida Anderson-Lozano on
We are building a healthcare project and have registered our project as LEED for NC. We have a question concerning exterior lighting.
Zero lot line with lighting on the facade
NC-2009 SSc8:Light Pollution Reductionposted by Mathilda Jonsson on
Hi all! Our project is a zero lot project adjacent to a public walkway.The municipality will not provide any street lighting for the public walkway.
LZ2 - LZ3
NC-2009 SSc8:Light Pollution Reductionposted by Marcio Alberto Casado Pereira on
My project is located in an industrial zone, entitled as Urban Area with Priority Densification.
Billboards during construction
NC-2009 SSc8:Light Pollution Reductionposted by Gahl Sorkin Spanier on
The contractor on a LEED site would like to put a billboard up.