100% well or non-potable water
EBOM-v4 WEc3:Cooling tower water useposted by Elizabeth Dunn on
Our building uses 100% well or non-potable water.
No cooling towers
CS-v4 WEc3:Cooling tower water useposted by Mike D on
If there are no cooling towers as part of the project, can the credit be automatically achieved?
potable water analysis
CS-v4 WEc3:Cooling tower water useposted by sue bryant on
Can this be fulfilled via a City water quality report?
No cooling tower
NC-v4 WEc3:Cooling tower water useposted by Maria Porter on
If you have no cooling tower, do you automatically get the point or you are not eligible for the credit?
Is there a timeframe for the minimum number of cycles?
NC-v4 WEc3:Cooling tower water useposted by Gregory Martin on
I am working on a presentation to educate my office on Lv4. This being a new credit I don't think I am totally understanding the requirements.
Which parameters of the cooling tower?
NC-v4 WEc3:Cooling tower water useposted by Jade Deltour on
Which parameters/performances of the cooling tower need to be checked/optimised to limit tower cycles to avoid exceeding maximum values?
Maximum Number of Cycles
NC-v4 WEc3:Cooling tower water useposted by Apoorv Goyal on
Hi, based on a water test report, if the number of cycles already exceed 10, does that mean that both points are achievable?
Dry cooling tower
NC-v4 WEc3:Cooling tower water useposted by Sara Johansson on
Hi, If a project has dry cooling, a type of cooling tower, can it than get this point?
Campus Cooling Tower
NC-v4 WEc3:Cooling tower water useposted by Brightworks Sustainability on
My project is not installing a cooling tower, but they will utilize the shared existing campus cooling tower.
Option 2- "Waste" reduction
NC-v4 MRc5:Construction and demolition waste managementposted by Whitney Smith on
In option 2 of this credit, does the 2.5 pounds of "waste" mean 2.5 pounds of non diverted waste?