Forum quick links
Hardscape covered by building.
NC-2009 SSc7.1:Heat Island Effect—Non-Roofposted by Robert Webber on
I'm working with a team on a hotel project, which is a highrise in a dense urban environment (100% of the site is covered by the building).
Assembly Calculator Output not Mats and Res. Spreadsheet Input
CI-2009 MRc4:Recycled Contentposted by Maria Papiez on
The assembly calculator for recycled content output is a dollar amount contribution.
Advantages of v4 Schools over NC
posted by GBD Architects on
Hi all, We are analyzing a project that is on a higher ed campus but serves pre-K students.
Platinum Certification
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Muzammal Abbas LEED AP (BD+C) on
We had submitted one of our LEED EBOM project final review and received 72 points. We had accepted the review and received Certified Gold Level.
LEED Platinum
EBOM-2009 EAp1:Energy Efficiency Best Management Practicesposted by Muzammal Abbas LEED AP (BD+C) on
We had submitted one of our LEED EBOM V4 project final review and received 72 points. We had accepted the review and received Certified Gold Level.
LEED V4 Rating System : Game Arcade
posted by MKK LEED on
Hi All, We are working on a C&S Mall Project, and one of the tenants wants to certify they space, their space is going to be a game arcade with some small attractions (bumper cars and other st
Path 6 - Light Pollution Reduction
CI-2009 SSc1:Site Selectionposted by Erin Holdenried on
Does this path apply to only the spaces within the scope of work/LEED project, or the whole building the LEED project is located in?
Central Chilled Water Plant
NC-v4 EAc6:Enhanced refrigerant managementposted by Wes Lawson on
For NC major renovation, when building is served by a campus central chilled water plant, does the central plant's refrigerant characteristics count towards the calculations required for this credi
Shared HVAC system with non-LEED building
NC-v4 EAc2:Optimize energy performanceposted by GBD Architects on
Hi all, We are looking to certify a new building on a higher-ed campus that will be sharing HVAC systems with an existing building. The existing building will likely not pursue certifications.
Landscape Under Covered
NC-2009 SSc5.2:Site Development—Maximize Open Spaceposted by Anthea Ng on
Hello, My project has a open landscaped G/F partially covered by 2/F structure. Shade tolerant plant species shall be adopted at the covered areas.