FAQs about EAp2 :

Can the Passive House Planning Package (PHPP) be used to energy model for LEED?

Is it acceptable to model a split-type AC with inverter technology compressor as a heat pump, like modeling VRF?

Can the Trace 700 'LEED Energy Performance Summary Report' by uploaded to LEED Online in lieu of the Section 1.4 tables spreadsheet?

A portion of our building envelope is historic. Can we exclude it from our model?

Which baseline HVAC system do I use if my building has no heating or air conditioning?

For an existing building, do I need to rotate the model?

Our project has a diesel backup generator. Should we include it in our energy model?

Our project has a large process load—75%. Despite our efforts to make an efficient HVAC design, the cost savings are minimal. What can we do to earn this prerequisite and be eligible for LEED certification? Is there any flexibility in how we model the p

Can SHGC be higher in the proposed than in the baseline model?

Our process load is higher than 25%. Do we have to justify that?

Do I need to justify the electrical and fuel rates I am using in my model?

Our local code references ASHRAE 90.1-2010. Should I use that for my documentation, or 90.1-2007?

Can I claim exterior lighting savings for canopy lighting even though a baseline model cannot include shading elements?

The project is built on a site with existing exterior lighting installed. How should this be accounted for?

Can mezzanines open to floors below be excluded from the energy model?

How do I provide a zip code for an international location?

For a project outside the U.S., how do I determine the climate zone?

For a project outside the U.S., how do I determine the Target Finder score?

Do hotel rooms need automatic light shut-off control?

How commonly are the 90.1 mandatory compliance forms submitted as part of EAp2/EAc1?

View answers »

Forum discussion

NC-2009 EAp2:Minimum Energy Performance

District Energy System (DES) based on CHP plant

A building that is being certificate under LEED 2009 will be built in a campus with a dedicated District Energy System (DES) based on a combined heat and power plant (CHP). This DES is working for more than 5 years, serving several other buildings that started its activity along with the DES. LEED Guidance for this case (Treatment of District or Campus Thermal Energy in LEED V2 and LEED 2009 – Design & Construction, August 2010 – APPENDIX D) states that CHP electricity shall be allocated to the Proposed Building in the proportion of heat used by it. The question is how to calculate the proportion of heat that the new building will use (please note that historic data from the DES only accounts for the existing buildings only). Our proposal is: 1) If the DES system has capacity to feed the 100% of the new building heating needs (calculated by energy simulation), then we will make the calculation assuming that 100% of the proposed building heating needs will be fed by the DES. Heating energy use of the other buildings will remain the same; 2) If the DES system has not capacity to feed 100% of the new building heating needs (calculated by energy simulation), then we will make the calculation assuming that the proposed building will use all the capacity of the DES that is now available. DES heating energy supply to the existing buildings will remain unchanged. Do you agree with this option ?

0

You rely on LEEDuser. Can we rely on you?

LEEDuser is supported by our premium members, not by advertisers.

Go premium for $15.95  »

Add new comment

To post a comment, you need to register for a LEEDuser Basic membership (free) or login to your existing profile.