Post a question or comment
Filter by location
Forum
Topic
Replies
Recent

Grout additive?

NC-2009 IEQc4.1:Low-Emitting Materials—Adhesives and Sealants
posted by  Erin Holdenried  on 

What category would a grout additive fall under? Thanks!

1
Thu Mar 10, 2016, 7:01 pm

Multi-Flow Showerhead

NC-2009 WEp1:Water Use Reduction—20% Reduction
posted by  Annalise Reichert  on 

I am working on a project that plans to install a shower head with three flow options: 0.5 GPM-1.0 GPM -1.5 GPM. How do we account for multi-flow showerheads on the WEp1 form?

1
Wed Mar 2, 2016, 10:14 pm

Shared underground parking with non LEED certified buildings

Healthcare-v2009 MPR3:Must use a reasonable site boundary
posted by  Jorge Lopez de Obeso  on 

Our project, a 200,000 sqft CS office tower (much more to the 20% of the total area) shares 3 levels of underground parking lot with two other buildings (Movie theater, shops, restaurants).

0

Towers as part of a single building

NC-v4 EAp2:Minimum energy performance
posted by  Francesco Passerini  on 

A building is composed by three towers that have the basement, the ground floor, and the first floor in common. The system for the baseline model shall be System 8.

1
Thu Mar 3, 2016, 3:33 pm

MBTU = 1 million BTU, which is also MMBTU

General forums
posted by  Jamy Bacchus  on 

It's come to my attention that there's some unit confusion in the LEED Treatment of District Thermal Energy Guide where DES virtual rates are calculated. The Guide includes equations on page 14 in

1
Thu Mar 3, 2016, 3:12 pm

Project Boundary

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  Antje Holdefleiss  on 

Hello Everyone I have the following questions regarding the LEED Project boundary: · Are the project boundary only referring to the ground floor?

1
Wed Mar 16, 2016, 6:56 pm

Glass Demo

NC-2009 MRc2:Construction Waste Management
posted by  Donald Green  on 

Has anyone had any luck recycling glass taken from a commercial building? They are double pane commercial units removed from the curtainwall system.

1
Thu Mar 3, 2016, 4:10 pm

WEc1 - We don't really have a "SITE" outside of the building env

Retail-NC-v2009 WEc1:Water efficient landscaping
posted by  Lou Niles II  on 

Hello I am working on Two Separate projects that actually overlap on a site; they are not registered as Master Site or Campus and we don't want that at this time. Project A Surrounds Projects B. Pr

1
Sat Aug 26, 2017, 11:54 pm

Existing Lighting in a TI

CI-2009 EAp2:Minimum Energy Performance
posted by  Annalise Reichert  on 

I am working on a TI retrofit project that did not replace any existing lighting in their space due to budget constraints.

1
Thu Mar 3, 2016, 9:27 pm

Submitting for a CIR or LEED Interpretation

General forums
posted by  Deborah Lucking  on 

We understand that the only way to submit for a CIR is through the registered project LEED Online platform.

0