Forum quick links
Campus for a gated residential/commercial compound versus ND
posted by ABDELHAMID BESHARA on
We have a gated Residential Compound consisting of around 60 buildings - 4 to 5 stories high - different models.
Core and Shell v3 w/ ASHRAE 90.1-2010 w/o tenant agreement
CS-2009 EAp2:Minimum Energy Performanceposted by Curtis Clark on
We are working on a very large, core and shell project that the owner will not share the tenant agreement with our team. The minimum code requirements are based on IECC 2012/ASHRAE 90.1-2010.
Energy Performance for Retail
Retail-CI-v4 EAp2:Minimum energy performanceposted by Jeff Halliwell on
I'm working on modeling a restaurant under ASHRAE 90.1 2010. One of the issues is the main source of heating is a hybrid electric/gas system with majority of it being electric (i.e. strip heat).
LEED V4 - TENANT SPACE ENERGY MODELING
Retail-CI-v4 EAp2:Minimum energy performanceposted by Paula Hernandez on
Hi, Regarding the Energy Performance Calculator that should be used instead of Table 1.4, my questions are: 1.
Multiple Buildings or One Building Certificacion
CS-2009 MPR3:Must use a reasonable site boundaryposted by Paula Hernandez on
We have a C&S Project that has two identical buildings in the same parcel.
Store targeting LEED CI certification within a mall
Retail-CI-v2009 EAc1.5:Optimize energy performance - building envelopeposted by Anne-Claire BARBERI on
Hello, We are working on LEED CI certification for a store within a mall. If the store has no external facade, does this credit can be achieved?
Basement That Extends to Plot line
NC-2009 WEc1:Water Efficient Landscapingposted by Omar Elrawy on
Hi, My project has two levels basement that extends to the land's plot line, while the above-grade floors are much smaller areas than the basement area.
energy savings for tenant vs Materials & Resources credits
CS-2009 EAp2:Minimum Energy Performanceposted by Richard Mathews on
We designed the Core & Shell of this building as one project - and subsequently also designed most of the tenant occupancies, so we know that there are savings in the lighting for the various t
EBOM recertification for SSc1 path
EBOM-2009 SSc1:LEED Certified Design and Constructionposted by AtSite Inc on
It is still unclear to me what "ongoing tracking" means to be eligible for SSc1 when pursuing via an EBOM recertification.
FTE of hotel guests
NC-2009 PIf3:Occupant and Usage Dataposted by Rob Hink on
How do I calculate FTE of hotel guests? I know have to do it during non-peak time of year and peak time of year. Also what do I do for visitors and transients?