Forum quick links
Miles per gallon
EBOM-2009 SSc4:Alternative Commuting Transportationposted by Jennifer Webb on
Hello, We are conducting a survey with government employees and are trying to reduce the survey length as much as possible. Do miles per gallon (mpg) need to be included in the survey or would ma
Energy model for a version 4 project in a version 2009 project
CS-2009 EAp2:Minimum Energy Performanceposted by Mathilda Jonsson on
Hi all! We started up a LEED for CS version 4 project and got really good results for the energy model.
Power Adjustment Percentages for Automatic Lighting Controls
CS-2009 EAc1:Optimize Energy Performanceposted by Ciaran McCabe on
Hi, I am producing an energy model for a a refurbished building with a new lighting scheme. The installed LPD is 9 Watts /m2 using LED.
CS Project with no ref equipment
CS-v4 EAc6:Enhanced refrigerant managementposted by Martin Stowell on
I am working on a CS project and the drawings do not have any planned ref equipment since this will be at the tenants discretion to decide at a later date. If our plans do not include ref equipmen
Project Mexico
NC-2009 PIf2:Project Summary Detailsposted by Alejandro Macias on
I'm starting to work on the certification of a building in a small town in Oaxaca,Mexico .
Existing Building Envelope does NOT Meet ASHRAE 90.1-2007
CI-2009 EAp2:Minimum Energy Performanceposted by James Keohane on
How do you meet and demonstrate requirements of EApr2 if elements of the existing building envelope does NOT meet 90.1-2007 Prescriptive measures?
Airflow testing service
EBOM-2009 IEQp1:Minimum IAQ Performanceposted by Saul Pichardo, AIA on
Hi All, We are looking for a company in the San Francisco Bay Area who can conduct the airflow tests in our commercial building (in the office area). We are working on a LEED O&M project.
LEED v 4 deadline
posted by Tobias Berge on
We are planning to register a LEED v 4 Core & Shell project on LEED Online.
FTE for campus or for building
NC-2009 WEp1:Water Use Reduction—20% Reductionposted by Karen Elliott on
We have a manufacturing campus and are assessing a new office block within that campus.