Forum quick links
Recycling infrastructure - inconsistency in reference guide
ND-Plan-v4 GIBc16:Solid waste managementposted by Nate Tsang on
The requirements and the step-by-step instructions are inconsistent.
Multiple AHUs for one space
EBOM-2009 IEQc1.3:IAQ Best Management Practices—Increased Ventilationposted by Patrick Cellie on
I'm currently dealing with a convention center that has large ballrooms and meeting rooms served by multiple AHUs.
Exhaust in Copy Rooms
NC-v4 EQp1:Minimum indoor air quality performanceposted by Charline SEYTIER on
In one of our projects, the client is willing to have open spaces with high flexibility. In these open spaces, “boxes in the box” for copy rooms will be created.
Emission Reporting (ISO 14064/ Portfolio Manager)
EBOM-2009 EAc6:Emissions Reduction Reportingposted by Esteban Martinez on
Hi, We are working in a project in Colombia.
How i can use Portfolio Energy Star to Colombia
EBOM-2009 EAp2:Minimum Energy Efficiency Performanceposted by Esteban Martinez on
Hi, We have a project that aims LEED EBOM certification. The project is a school. We enter the data of energy consumption and water consumption in Portfolio Energy Star.
Circulation space around the building core
CS-v4 EQc4:Daylightposted by Julien Richard on
For Core&Shell projects, the reference guide specifies : “Assume that the entire floor plate, except for the core, will be regularly occupied space “.
FTE calculation and use associated for visitors
Healthcare-v2009 WEp1:Water use reductionposted by Annabelle Lam on
I am working on a hospital project where I have both inpatients and visitors.
LEED Online Form Help for Process Water
Retail-CI-v2009 WEp1:Water use reductionposted by Sara Zoumbaris on
Hello, I have a project with three pieces of process water equipment and I have a few questions about the form. 1.
WE Credit 4.2: Cooling Tower Water Management- non potable
EBOM-2009 WEc4:Cooling Tower Water Managementposted by satheesh M on
The project’s cooling requirement is being met by both chiller plant inside the project boundary as well as the chiller plant in the Building Owned DES.
Exempt area of 10% in a Group Project
posted by Gabriel Frasson on
We have a site that contains two buildings that are being certificate as a campus project. In the ground floor of Tower A there are some stores that we want to exempt of the certification project (